The ground is provided with a sub warehouse seam processing method

Mondo Home Updated on 2024-02-25

The following is a summary of the relevant topics about the processing method of the ground setting compartment seam, if you want to know more about this, you can take a look at the relevant introduction below.

Ground setting sub-silo joint is a processing method carried out in the process of ground laying, and its function is to set gaps in some areas or positions of the ground to reduce the cracks caused by temperature changes or foundation settlement on the ground. The following will briefly introduce the processing methods, common problems and solutions of the ground setting silo joints.

First, the processing method of setting up the sub-warehouse seam on the ground:

1. Before laying on the ground, determine the position and size of the sub-warehouse joint, and mark it according to the design requirements.

2.Use a professional ground cutting machine or a hand-held chainsaw and other tools to cut the position where the bin seam needs to be set, and the cutting depth is generally 1 4 to 1 3 of the ground thickness.

3.Clean the cut crevices and remove debris and dust.

4.Fill the cut gap with an appropriate amount of elastic sealing material, such as rubber strips or polysulfide glue.

5.Flatten the surface of the gap filled with sealing material to ensure that the ground is flat and free of debris.

2. Common problems and solutions for setting up sub-silo joints on the ground:

1. The sub-silo joint is not set in place or the size is not appropriate: this will cause cracks in the ground when the temperature changes or the foundation settles. The solution is to fully consider the characteristics of the ground and environmental factors in the design, and determine the reasonable location and size of the sub-silo joint.

2.Aging or detachment of the filler material in the slots: This can cause the gap to lose its sealing properties, which in turn can cause cracks in the floor. The solution is to regularly check the condition of the filling material in the sub-bin joint, and replace the aging or falling off filling material in time.

3.The joints of the sub-silos are not leveled: this will lead to unsightly gaps in the ground and affect the overall effect. The solution is to flatten the surface of the gap filled with sealing material to ensure that the ground is flat and free of debris.

The processing method of setting the sub-silo joint on the ground is simple and clear, but it is necessary to pay attention to the details and quality control in the actual construction, solve the common problems in time, and ensure the effect and service life of the sub-silo joint on the ground.