Recently, there have been many people who have consulted about how to install the building façade compartment joints, and the following is an article about it, and you will have a more in-depth understanding of it after reading it.
The sub-silo joint of the curtain wall of the building façade refers to the gap set at the connection of the aluminum profile of the curtain wall. The following is a detailed description from multiple perspectives such as installation steps, construction precautions and quality inspection
1. Installation steps:
1. Determine the position and size of the sub-silo joint, and arrange it according to the design drawings.
2.Install a horizontal line to ensure that the position of the silo seam is accurate.
3.Install the sub-silo joint supports, which are generally made of aluminum alloy profiles and fixed on the façade structure.
4.Install the filling material of the sub-bin seam, which is usually silicone glue or polyurethane with good weather resistance.
5.Install the aluminum plate of the sub-bin joint, and connect the aluminum plate with the support.
6.Carry out sealing treatment to ensure the tightness of the silo seam.
2. Construction precautions:
1. When installing the sub-bin joint, pay attention to keeping it level and avoid tilting.
2.The filling material of the compartment joint should be made of materials with good weather resistance and strong adhesion to ensure the sealing of the separation joint.
3.When installing the aluminum plate, it is necessary to pay attention to the fixing firmly to avoid potential safety hazards caused by the aluminum plate falling off.
4.During the construction period, the connection parts of the sub-silo joints should be inspected to ensure that the connection is firm.
3. Quality inspection:
1. Check whether the position and size of the silo joint meet the design requirements.
2.Check whether the appearance of the sub-bin joint is smooth, without deformation and damage.
3.Check the sealing performance of the bin seam and confirm the adhesion and waterproof performance of the filling material.
4.The wind pressure resistance test is carried out on the connection part of the sub-bin joint to ensure that its wind pressure bearing capacity meets the standard requirements.
Through the above steps and precautions, the installation quality and sealing performance of the sub-warehouse joints of the building façade curtain wall can be effectively ensured, and the overall appearance and safety of the building can be improved.