1. Installation steps.
1.Confirm the installation location.
The card access control machine should be installed in a convenient and easy-to-maintain location, such as on the side of a large gate or on a wall. At the same time, considering the convenience of personnel access and safety factors, the location that is within the monitoring range and not easy to be hit should be selected.
2.Prepare tools and materials.
Before installation, you need to prepare the following tools and materials: screwdrivers, electric drills, access control all-in-one machines, access control system software, expansion screws, etc.
3.Install the fixtures.
According to the size and installation position of the access control all-in-one machine, punch holes in the corresponding position on the door or wall, and then install the fixings. The fixing should be firmly fixed to the door or wall to ensure that the access control machine will not fall.
4.Connect the power cord.
Connect the power cord of the access control machine to the power supply to ensure that the power supply voltage is consistent with the equipment requirements. Pay attention to the color and positive and negative poles of the power cord when connecting to avoid misconnection.
5.Connect the communication cable.
If the access control system needs to be connected to a computer or other equipment, it needs to be connected with a corresponding communication cable. Pay attention to the interface type and line sequence when connecting to ensure the correct connection.
6.Debugging the access control all-in-one machine.
After the installation is completed, the access control all-in-one machine needs to be debugged. Set up the access control all-in-one machine through the access control system software, and test whether the card swiping function and alarm function are working normally. If something goes wrong, you should make adjustments in time.
2. Precautions.
1.During the installation process, it is necessary to pay attention to protect the surface of the access control all-in-one machine to avoid scratches or impacts. At the same time, it is necessary to ensure that the wiring of power lines and communication lines is reasonable and beautiful, so as to avoid potential safety hazards.
2.When connecting the power line and communication cable, it is necessary to connect in strict accordance with the wiring requirements of the equipment, and do not wiring or changing the wire sequence at will, so as not to cause damage to the equipment or system failure.
3.When debugging the access control all-in-one machine, a single debugging should be carried out first to ensure that each card access control all-in-one machine can work normally. Then the system is debugged to check whether the overall operation of the access control system is normal.