Construction standards for artificial turf gateball courts
1. Preparation before construction.
Before construction, it is necessary to ensure that the site is flat and free of debris, and the uneven area is trimmed to ensure the stability of the foundation laid on the lawn. At the same time, it is necessary to check whether the dimensions and elevation of the site meet the design requirements, as well as the patency of the drainage system.
Artificial turf per square meter**.
Second, the foundation laying.
Foundations are key to turf stability, so construction must be carried out in strict accordance with the design requirements. Generally, cement concrete or asphalt concrete is used as the basic material, which requires high strength and good flatness. When laying the foundation, it is necessary to reserve a certain drainage slope to prevent water accumulation.
3. Artificial turf laying.
Artificial turf should be protected from direct sunlight and humid environment during transportation and storage, so as not to affect its quality and longevity. Before laying, check the quality and color of the grass silk to ensure that it is flawless. When laying, it should be carried out in accordance with the design requirements to ensure that the direction of the grass silk is consistent, the splicing is tight, and there are no wrinkles. At the same time, pay attention to the flatness of the lawn and the slope of the drainage.
Fourth, underline. After the artificial turf is laid, the lines are marked. Generally, environmentally friendly paint is used for marking, with bright color, wear-resistant and environmentally friendly. When marking the line, it should be carried out in accordance with the design requirements to ensure that the line is clear and straight.
5. Drainage system.
The drainage system of the gateball court mainly consists of two parts: drainage ditches and seepage wells. The drainage ditch is generally set around the site, and the width and depth should be determined according to the actual situation, and the drainage is required to be smooth. Seepage wells are generally set up in low-lying areas of the site to collect surface water such as rainwater to prevent water accumulation.
6. Quality inspection and maintenance.
After the construction of the artificial turf gateball court is completed, quality inspection should be carried out to ensure that all indicators meet the design requirements. In the process of use, regular maintenance should be carried out to keep the site clean and tidy, and the grass silk is brightly colored. At the same time, it is necessary to regularly check whether the drainage system is smooth to prevent damage to the site caused by stagnant water.
In short, the construction standard of artificial turf gateball court is the key to ensure the quality and stability of the site. In the construction process, the construction should be carried out in strict accordance with the design requirements to ensure that the indicators meet the standards. At the same time, it is necessary to strengthen quality inspection and maintenance to ensure the long-term stable use of the site.