The Chihuang high speed railway catenary has been fully electrified, and the railway department has

Mondo Social Updated on 2024-02-01

Dawan NewsThe reporter learned from China Railway Shanghai Bureau Group that the Chihuang high-speed railway began to transmit power on the whole line at 9 o'clock on January 10, laying a solid foundation for the upcoming hot slip and joint commissioning and joint test. At that time, all power supply lines, catenary, equipment and facilities along the line will be in a live state.

Catenary power transmission is an important node in the process of railway construction. After power transmission, all power supply catenary and its connected parts along the line have 275kV high-voltage electricity, which is equivalent to 125 times the voltage of 220 volts in household electricity. In order to ensure the safety of people's lives and property and ensure the safe and smooth flow of railway transportation, the railway department reminds units and residents along the line to strictly abide by the "Railway Law of the People's Republic of China", "Railway Safety Management Regulations", "Anhui Provincial Railway Safety Management Regulations" and related laws and regulations, and it is strictly forbidden to throw objects to the electrified railway catenary, and it is strictly forbidden to raise and fly kites, balloons and other low-altitude floating objects within a range of 500 meters on both sides of the railway power line wire, and it is strictly forbidden to climb the railway power line tower or erect it on the tower. For the installation of other facilities and equipment, it is strictly forbidden to take soil, drive piles, drill, hoist or dump harmful chemicals within 20 meters around the railway power line towers and pull lines, and it is strictly forbidden to approach the electrified railway catenary, as well as other behaviors that damage railway power line facilities.

It should be noted that the fence on both sides of the railway line is a special safety barrier to prevent pedestrians and animals from entering the railway line, and it is forbidden to move and damage the protective fence and other protective equipment, and it is also forbidden for irrelevant personnel to enter the protective fence for any reason, otherwise the public security organs will carry out public security penalties in accordance with the law, and criminal responsibility will be investigated for serious consequences. The railway department reminds that residents along the line should strengthen the supervision and education of minors and persons with limited capacity to improve their awareness of road protection and road protection; At the same time, it is necessary to take good care of their own cattle, sheep, pigs and other large livestock and strictly prevent them from entering the protective fence.

The Chi-Huang high-speed railway is an important part of the Wuhan-Hangzhou high-speed railway corridor, the line from Chizhou Station to Huangshan North Railway Station, the main line of the new line is about 125 kilometers long, the design speed is 350 kilometers per hour. There are 5 stations on the whole line, including Chizhou, Jiuhuashan, Huangshanxi, Yixian East and Huangshan North. After the project is completed and opened to traffic, it will become a first-class tourist route connecting the core scenic spots of two mountains and one lake in southern Anhui (Jiuhua Mountain, Huangshan Mountain and Taiping Lake), which is of great significance for improving the layout of the regional railway network, accelerating the construction of the international cultural tourism demonstration zone in southern Anhui, and promoting the coordinated economic and social development along the line.

Dawan News reporter Liu Yang, correspondent Xu Wenfeng, Wu Shiliang.

Edited by Zhang Dawei.

Related Pages