After the year, the renovation should resume work sooner rather than later! Don t forget these preca

Mondo Home Updated on 2024-02-23

With the end of the Spring Festival holiday, people have returned to work, life has returned to normal order, and many families have also begun to renovate and resume work. In the process of resumption of work, in order to ensure the smooth progress of the project and avoid potential safety hazards, the owner and the decoration company should pay attention to the following aspects:

1. Resumption of work inventory

The first task of resuming work after the holiday is to take stock of the site and conduct a comprehensive inspection of the resumption site. According to the list of items on the site before the shutdown, including the building materials provided by the decoration company, the building materials purchased by the owner and the work tools stored on site, etc., are compared one by one to ensure that they are correct.

The main purpose of the inspection covers two aspects: one is to assess whether the materials sealed before the holiday are damaged, and the other is to check the doors and windows for signs of burglary, verify the quantity of materials, and ensure the safety of materials.

Finally, it is necessary to check the use of water, electricity and gas on the site during the shutdown period, and confirm that it is correct before the water and electricity can be connected.

2. Worker handover

Around the Spring Festival is the peak period for the flow of people, and the decoration industry is no exception. Before resuming work after the holiday, it is necessary to confirm the personnel changes of the decoration workers, verify the handover of workers, ensure that the new workers understand the engineering process and construction technology, and avoid the problem of improper connection in the construction process.

3. Engineering inspection

Before the official resumption of work, it is necessary to re-inspect the processes that have been completed before the previous year. Because after a Spring Festival holiday, many problems that were not found during acceptance will be exposed, and they can be solved in time if they are found in time.

Carpentry: whether there are problems such as deformation, cracking, mold, etc.

Oilman: whether the latex paint is hollow, blistering, cracking, and whether there are cracks at various joints.

Bricklayer: Whether there are problems such as tile hollowing.

Hydropower: whether there is freezing and cracking in the water pipe interface and exposed places.

4. Weather impact

After the year, the renovation should be resumed sooner rather than later, especially in the southern region, and the construction should be completed as soon as possible before the arrival of the return to the south, otherwise the highly humid air will greatly affect the progress and quality of the project. In addition, it is also necessary to pay attention to the phenomenon of "inverted spring cold" to prevent the impact of too low temperature on construction.

From inventory, worker handover, engineering inspection to weather impact, every aspect of the resumption of work requires our meticulous attention and implementation. Pay attention to Hunan Jinhuang decoration and learn more about decoration knowledge!