The western section of Jingliang Road is officially opened to traffic! Fengtai Fangshan into Beijing

Mondo Social Updated on 2024-02-09

Original title: The western section of Jingliang Road is officially opened to traffic! Fengtai Fangshan into Beijing important connection channel smoothly through

Worker**-China Labor Network reporter Lai Zhikai.

On February 7, the "Western Section of Jingliang Road", which is an important connecting passage between Fengtai and Fangshan into Beijing, was officially opened to traffic. The construction of the project realizes the rapid connection of the fifth ring road, the sixth ring road, the Beijing-Kunming Expressway and the Beijing-Hong Kong-Macao Expressway in the southwest, and provides fast access for residents in Fangshan Liangxiang Group, Qinglonghu, Yanshan, Fengtai Hexi and other areas to enter and exit the central city, greatly alleviating the traffic pressure in and out of the central city in the southwest region, and providing more perfect transportation infrastructure conditions for regional construction. It plays an important role in driving the economic development of the regions along the route.

The west section of Jingliang Road project starts from the east side of the Sixth Ring Road in the west, connects with the main line toll station of the current Beijing-Kunming Liaison Line, and connects with the current Jingliang Expressway in the east to the west side of the Beijing-Hong Kong-Macao Expressway, with a total length of about 373 kilometers, the main road is built according to the standard of urban expressway, with two-way six lanes; The auxiliary road is constructed in accordance with the standard of urban secondary trunk roads, with two-way four lanes. There is 1 diamond-shaped interchange across Liang 3rd Road on the whole line, and the auxiliary road of Jingliang Road and the current Liang3rd Road are connected; Two semi-diamond-shaped interchanges are set up across the Yakniu River and Xiwangzuo Road respectively, which are connected to Nangong South Road and Xiwangzuo Road respectively. The project requires the acquisition of about 410 acres of collective land, about 75 cases of vacated homesteads and about 60 non-residential houses.

With the joint efforts of relevant departments of Beijing, Fengtai District and Fangshan District, the road project of the western section of Jingliang Road, which is under the construction and management of the first construction company of the first group, has been completed and opened to traffic on February 7.

After opening to traffic, the Beijing-Hong Kong-Macao Expressway and the South Fifth Ring Road can save about 20 kilometers and save about 30 minutes from Fangshan Yanshan and Qinglonghu areas to the center, which greatly facilitates the travel of surrounding citizens.

Worker: Worker client.

Related Pages