No notices were posted on the road, the entire road was blocked, and residents complained that it wa

Mondo Social Updated on 2024-02-01

** Urban Live Original

Do not ** without permission

Recently. Mr. Xiong from Nanchang, Jiangxi.

Call the city scene to reflect.

The Baizhang Mountain Road in front of his house was closed due to road repair.

It's different from building roads in the past.

After the road was closed, there was no intersection.

This is very inconvenient for residents living in the vicinity.

According to Mr. Xiong's reflection, the urban on-site reporter also went to the junction of Baizhangshan Road and Wugongshan Avenue, and indeed found that the road section was fenced before and after, and there were construction personnel on duty at the scene to prohibit vehicles from entering.

Mr. Xiong: Completely ignoring us, only considering our own convenience, all of them are blocked, which is not conducive to our life and travel. You should at least fix one side and seal the other, and you can't seal them all at once.

Mr. Xiong said, hereHe didn't know that the road was about to be closed for repairs, since there was no notice, the reporter saw it at the sceneIndeed, there are many vehicles that come to the intersection and turn back.

U-turn vehicle).

Mr. Xiong: This road is blocked, and I didn't say that there would be an announcement next to it.

Nearby residents: The whole road is blocked, the traffic is not smooth, and you can't see that the car can't get in. I haven't been notified, so I should stay on the road and do it at the same time.

Nearby residents: I don't know, mainly because I didn't know beforehand and came here. If you had known in advance, you wouldn't have gone this way.

Subsequently, the city on-site reporter came to the Management Committee of Nanchang New Economic Development Zone to understand the situation. The person in charge of the upgrading and transformation project told reporters that the road in the Baizhang Mountain section was damaged in many places before, and the road surface was full of potholesIt was included in the road white to black improvement plan。Now the time for upgrading and renovation is urgent, and the reason why they adopt fully enclosed construction is also to repair the road surface as soon as possible. The project leader also saidAim for 7-10 days to completeWe hope that the residents will understand and support us.

Zhu Bin, person in charge of the upgrading and transformation project of Nanchang New Economic Development Zone: Considering that we found a problem when we were doing it in the north of the national highway in the early stage. If half-width construction is adopted, it is easy to have serious safety hazards if it is not completely closed, especially at night. With this in mind, we strive to adopt a fully enclosed construction, which lasts from one week to 10 days, and then removes the enclosure as soon as it is completed.

Zhu Bin, the person in charge of the project, said that there is more than one entrance and exit in the nearby community, and during the construction of the road closure, nearby residents can choose to pass through other exits of the community.

Zhu Bin, the person in charge of the upgrading and transformation project of Nanchang New Economic Development Zone, will divide half of the construction time into two parts, which may be pulled to 20 days or even 1 month. So we want to finish this as soon as possible, so we also want to ask the people to support it.

Regarding the situation reported by nearby residents that no announcements were posted, Zhu Bin said that he would improve the relevant work as soon as possible, post announcements on the spot, and remind them in place.

Related Pages