1. Design and planningBefore the construction of the dust-free purification workshop, detailed design and planning are first required. According to the purpose, process requirements, cleanliness level and other factors of the workshop, reasonable layout and design are carried out. Determine the size, shape, structure, etc. of the workshop, and draw detailed construction drawings. In the design process, it is also necessary to take into account the requirements of energy saving, environmental protection and safety.

2. Construction preparationBefore construction, it is necessary to make adequate preparations. Including the organization of the construction team, the preparation of construction equipment, the procurement of construction materials, etc. At the same time, it is also necessary to carry out technical training and safety education for construction personnel to ensure construction quality and safety.

3. Ground treatment is the focus of the dust-free purification workshop, which requires special treatment. Generally, epoxy resin self-leveling ground or antistatic PVC floor is used, which has the characteristics of wear-resistant, non-slip and easy to clean. When treating the ground, it is necessary to pay attention to the requirements of the flatness, slope, dustproof and other aspects of the ground, and carry out adequate cleaning and disinfection.

Fourth, the wall treatment wall is also an important part of the dust-free purification workshop, which is generally built with color steel plate, stainless steel plate and other materials. When treating the wall, it is necessary to pay attention to the requirements of the flatness, corrosion resistance, and dustproof of the wall. At the same time, there shall be no defects such as open lines and protrusions on the wall, so as not to affect the cleanliness of the workshop.

Fifth, the top surface treatment of the top surface is another focus of the dust-free purification workshop, which is generally built in the form of a suspended ceiling. When treating the top surface, it is necessary to pay attention to the requirements of the flatness, corrosion resistance, fire prevention and other aspects of the top surface. At the same time, it is necessary to take into account the airflow organization and temperature distribution in the workshop, and reasonably design the height and shape of the ceiling.

6. Air shower room installation Air shower room is a necessary equipment for dust-free purification workshop, which is used to remove dust particles on the surface of personnel or items. When installing the air shower, it is necessary to pay attention to the requirements of the air shower room, such as layout, airflow organization, and filter replacement. At the same time, it is necessary to ensure that the door of the air shower room is well sealed and there is no air leakage.

7. Filter installationThe filter is the core equipment of the dust-free purification workshop, which is used to filter dust particles in the air. When installing the filter, it is necessary to pay attention to the requirements of the filter's model, specification, installation location, etc. At the same time, it is necessary to ensure that the sealing performance of the filter is good and there is no air leakage.

8. Lighting equipment installation Lighting equipment is an important equipment in the dust-free purification workshop, and it is necessary to select the appropriate lamps and light sources and install them in accordance with the design drawings. When installing lighting equipment, it is necessary to pay attention to the location, angle, illumination and other requirements of the lamps to ensure that the lighting effect of the workshop is good. At the same time, energy saving and environmental protection requirements need to be taken into account.

9. Electrical engineering installationElectrical engineering is an important part of the dust-free purification workshop, including the installation of distribution boxes, cables, wires and other equipment. When installing electrical engineering, it is necessary to carry out construction in accordance with the design drawings and relevant specifications to ensure the safety, stability and reliability of the electrical system. At the same time, it is also necessary to take into account the requirements of energy saving and rationally design the electrical system.

10. After the completion of the acceptance and testing construction, it is necessary to carry out the acceptance inspection of the dust-free purification workshop. Including cleanliness testing, wind speed testing, airflow organization testing, etc. At the same time, the electrical system needs to be tested to ensure that the indicators of the workshop meet the design requirements. After passing the acceptance, it can be put into use.