Precautions for new cooling tower construction

Mondo Social Updated on 2024-02-22

Cooling tower construction is an important project that requires consideration of many factors, including the model, size, location, materials, and construction methods of the cooling tower. Below I will introduce in detail the model selection, design points, construction methods, project acceptance and later maintenance of the cooling tower.

First, the model selection of the cooling tower.

When choosing the model of the cooling tower, you need to choose according to the actual needs. For example, for cooling towers for general domestic use, small open cooling towers can be chosen, while for industrial use, large closed cooling towers are required. In addition, factors such as cooling tower noise, water consumption, and ease of maintenance need to be considered.

Second, the main points of design.

The design points of the cooling tower include the following aspects:

1.Determine the model and specification of the cooling tower, and choose according to the actual needs.

2.Determine the location and size of the cooling tower, taking into account factors such as wind direction, sunlight exposure, and the surrounding environment.

3.Choose the right equipment such as packing, pumps, and fans to ensure cooling and operational efficiency.

4.Reasonable design of air inlet, outlet pipe and drainage outlet and other structures to ensure the circulation of cooling water and the dissipation of heat.

Third, the construction method.

The construction method of a cooling tower includes the following steps:

1.Foundation production: make the foundation of the cooling tower according to the design requirements to ensure that the foundation is stable and reliable.

2.Assemble the tower body: Assemble each component according to the design drawings to ensure that the assembly is correct.

3.Install the packing: Install the selected packing to the packing bracket to ensure that the packing is flat, uniform and non-blocking.

4.Installation of pumps and fans: Install pumps and fans according to the design requirements to ensure their proper operation.

5.Connect water pipes and circuits: Connect water inlet pipes, outlet pipes, drain outlets, and electrical circuits to ensure that the water channels and circuits are unblocked.

6.Commissioning and operation: After all the installation work is completed, the cooling tower is commissioned and operated to ensure its normal operation.

Fourth, the project acceptance.

After the new construction of the cooling tower is completed, the engineering acceptance needs to be carried out to ensure that it meets the design requirements and use specifications. The acceptance content includes the following aspects:

1.Check whether the model, size, and dimensions of the cooling tower meet the design requirements.

2.Check that the individual components are installed correctly, firmly, and reliably.

3.Check that the filler is flat, uniform and free of clogging.