If you cooperate with a regular prefabricated heavy steel housing company, you will not only get a heavy steel villa, but also a more standardized, perfect and intimate whole-process service. This is far from comparable to the local construction team.
So what are the specific aspects? Today, according to the building process, we will give you a detailed comparison and introduction.
Set up a special team as soon as possible
Local construction team: Generally, the boss goes directly to talk, and uses a tape measure to make a simple comparison, no matter how you want to build, he says that there is no problem;
Prefabricated company: After determining the intention of cooperation, a special team composed of project managers, designers and structural engineers will be set up as soon as possible to go to the site for investigation, clarify the geological environment, studio and depth dimensions of the homestead, the center line of the house, etc., and conduct preliminary communication with the owner on the design of the house.
It should be emphasized that it is better to find a company that can calculate the area 100% according to the national standard, that is, the construction area, rather than the drip area that is more common in the industry. Taking a European-style villa with a construction area of 200 square meters as an example, if it is calculated according to the drip area, it will be at least 30 square meters more, which is the cost of tens of thousands.
Professional team, fixed business
Local construction team: most of them use public drawings, and some even only have a few sketches, without structural drawings and construction drawings;
Prefabricated company: There is a team of professional designers, many of whom have worked in well-known overseas architectural firms and large domestic construction enterprises, and have the ability to develop various styles of new Chinese, European, American, modern and other styles, so that customers can choose their favorite house type to modify, but also tailor a new house type.
Generally speaking, the first version of the floor plan can be given within 3 working days, and the customer can communicate at any time, and modify it until he is satisfied, and finally output a full set of house plan + structural drawing + construction drawing.
List the individual items** and materials in detail
Local construction team: can't take it out at all, opening your mouth is a fixed price, which is irrefutable, which can easily lead to cutting corners, shoddy and other chaos, and many low-price traps come from this;
Prefabricated company: through the list of materials**, the list will indicate in detail the specifications, unit price, dosage, material and process of each material, for example, the steel is divided into square steel and two different specifications of H-shaped steel, which are used as the main pillars and primary and secondary beams, which will be reflected in the list one by one, so that the owner knows where every penny of his money is spent.
Local construction team: there is no groundbreaking ceremony, small workers are now invited, generally have to be the owner of the meal, the process is like "opening the blind box", of course it is better to meet skilled workers, if it is a novice it will be troublesome, in short, most of them have not undergone professional training;
Prefabricated company: communicate with the owner to select the auspicious day of the zodiac, and send a special person to hold a standardized and grand groundbreaking ceremony for the owner free of charge, so as to pray for the good start of your house and the smooth project.
It is best for the cooperative company to have a team of first-class constructors and Luban Prize craftsmen, proficient in the most advanced assembly technology, all processes and processes have standardized requirements, and have an exclusive project manager on-site supervision and control.
In addition, it is best for the cooperative company to provide a real-time monitoring cloud platform for building housekeepers, so that owners can still view the construction progress through real-time monitoring even if they are out of town.
Detail the individual costs and materials used
Local construction team: the construction is slow and the construction period is long, and there is no delivery ceremony;
Prefabricated company: Thanks to the maturity of the prefabricated process and the professional construction team, a two-storey 200-square-meter European-style quality house can be completed in only 45 days at the earliest.
After the completion of the ceremony, a grand delivery ceremony will be held, and materials such as delivery certificate and after-sales service letter will be provided, so that customers can receive the keys to the new home in a full sense of ceremony and a warm atmosphere, and enjoy the joy of living in the new house.
The main body is maintained for life + exclusive housekeeper
Local Construction Team: None.
Prefabricated company: It has a standardized after-sales maintenance system in the industry, the main body of the steel structure is maintained for life, the overall house is guaranteed for 50 years, and the shelf life of other materials will also be written into the contract.
It is also equipped with a 24-hour exclusive after-sales butler, who can respond within 1 hour after receiving the repair report, arrive at the scene within 8 hours in the city, and arrive at the scene 24 hours in the core area, which can solve problems for the owners in the first time.