According to the first engineering bureau of China Water Resources and Hydropower, recently, Zhang Zhichao, project manager of Xinjiang Ruoqiang CSP project, said: "In 2024, we will complete the grid-connected power generation target of Ruoqiang CSP project. ”
The site of the 100,000 kW CSP (energy storage) + 900,000 kW photovoltaic demonstration project department in Ruoqiang County is located 25km south of Yitunbulak Town, Ruoqiang County, Bayingolin Mongolian Autonomous Prefecture, Xinjiang, and 190km southeast of Ruoqiang County. The solar thermal part of the project adopts the tower concentrating thermal power generation technology route, with a mirror field area of 650,000 square meters and a heat storage time of 8 hours.
The installed capacity of the CSP project is 100MW, and the whole plant is divided into three parts: the pre-plant area, the mirror field area, and the power generation area, of which the power generation area is surrounded by the mirror field area, and the power generation area is arranged with heat absorption tower, main plant, heat storage and exchange island, chemical workshop, heating boiler room, air compressor room, air cooling island, auxiliary cooling tower, etc. The heat sink is arranged on the top of the heat absorption tower, and the center elevation of the heat sink is 210m.
The steam generation system is located on a steel structure heat exchanger platform set between the cold and hot molten salt tanks, on the east side of the steam engine room. The steam generation system area platform is made of reinforced concrete + steel structure, which is divided into 5 floors.
After the completion of the Ruoqiang CSP project, it will become an important supporting power source in Ruoqiang County, which can effectively improve and stabilize the grid structure of the region, and is of great significance to accelerate the early realization of carbon peak, carbon neutrality goals, conversion of advantageous resources, and promotion of energy structure adjustment in Ruoqiang County, which will play a positive role in promoting the large-scale and base-based development of Ruoqiang County's energy industry and make new contributions to the high-quality economic development of Ruoqiang County.