Through the exchanges with many netizens in the past few days, many friends have asked about the topic of the construction sequence process of underground embedded parts, and this article will introduce the places that everyone is more concerned about.
The construction sequence process of underground embedded parts refers to the operation process and sequence of the installation of underground embedded parts in the process of civil construction. Underground embedded parts mainly include pipelines, cables and other equipment and pipelines, which are widely used in construction engineering, municipal engineering and other fields.
The construction of underground embedded parts is characterized by the need for accurate dimensional measurements and the accurate position of embedded parts. Mistakes in any one area can have a serious impact on the entire construction project, so a high degree of care and caution is required during construction.
The use of underground embedded parts construction mainly includes the following aspects:
1. Pipeline embedding: including water supply pipelines, drainage pipelines, gas pipelines, etc. These pipes are used for water supply, sewerage, and gas transmission in buildings.
2.Cable embedding: including low-voltage cables, high-voltage cables, etc. These cables are used for transmission functions in the fields of power, communications, etc.
3.Pipeline embedding: including hot water pipelines, steam pipelines, etc. These pipelines are used for heating, gas and other functions of the building.
4.Other embedded parts: also include ventilation ducts, fire pipes, etc. These embedded parts are used for the ventilation, fire protection and other needs of the building.
The construction of underground embedded parts has a wide range of applications, including various construction projects such as residential areas, commercial areas, and industrial areas, as well as municipal projects such as urban roads, bridges, and tunnels. Through the construction of underground embedded parts, all kinds of pipelines and equipment can be installed in concealment, which is not only beautiful, but also can reduce the floor space and improve the overall use efficiency.
The sequential process of underground embedded parts construction usually includes the following steps:
1. Planning and design: According to the actual needs and construction environment, the planning and design of underground embedded parts are carried out, and the type, quantity and location of embedded parts are determined.
2.Ground preparation: Before construction, the ground needs to be prepared, including cleaning, leveling, etc., so that follow-up work can be carried out.
3.Positioning and identification: According to the design drawings, the accurate position of the embedded parts is located and identified to ensure the accuracy of construction.
4.Excavation: According to the location of the mark, the excavation work is carried out on the ground, and the embedded parts exposed on the ground are partially cleared.
5.Installation and fixing: Accurately install the embedded parts into the excavated position, and use the fixing material to fix them in place to ensure the stability of the embedded parts.
6.Landfill: The void around the installed embedded parts is filled to ensure the smoothness of the ground and the appearance of beauty.
7.Acceptance and testing: Acceptance and testing of installed embedded parts to ensure that they meet the relevant standards and requirements.
8.Follow-up construction: After the installation of the underground embedded parts is completed, the follow-up civil engineering and decoration work can be carried out to achieve the final purpose of use.
The construction sequence process of underground embedded parts is an engineering operation process carried out in accordance with certain steps, and the accurate installation of underground embedded parts can be ensured through the scientific and orderly construction process, so as to ensure the stability and reliability of the project.