The reporter learned from the Beijing Municipal Transportation Commission that in order to cope with the large passenger flow of railways and civil aviation returning to Beijing, on February 17, Beijing West Railway Station and Metro Line 7 took measures for non-stop and continuous operation, in addition, Metro Line 2, Line 4, Line 9, Line 14, Capital Airport Line, Daxing Airport Line and other rail transit lines will take delayed operation measures.
Today is the last day of the Spring Festival holiday, and the Beijing Municipal Transportation Department has taken comprehensive measures such as subway delays, bus encryption, scheduling taxi (online car-hailing) "checkpoint" transportation, and increasing airport bus capacity to ensure that passengers can travel at night.
Beijing West Railway Station and Metro Line 7 have taken measures of non-stop operation and continuous operation. The up-and-down and down-to-line operation of Beijing West Railway Station of Metro Line 9 has been extended by 1 hour. The operating hours of No. 9, No. 21 and No. 387 will be extended, and the four routes of No. 14, No. 22, No. 23 and No. 36 will arrange mobile capacity to ensure passenger travel.
Beijing South Railway Station, Metro Line 14 Beijing South Railway Station upward direction extended operation 15 hours. Metro Line 4 will extend its operating hours by 1 hour. The bus capacity will be strengthened from 1 a.m. to 3 a.m. on February 18, and 7 spare buses will be added to the three night lines (night 15, night 17, and night 24), and a high-speed rail line will be opened in due course.
Beijing Fengtai Station, on February 18, Metro Line 10 opened 30 minutes early, and Line 16 opened 1 hour earlier. The bus strengthens the capacity of 2 high-speed rail special lines at Fengtai Station at night, adds 16 standby buses to the 2 special lines, and arranges an additional 10 standby buses at surrounding bus stations to be called at any time.
Beijing Railway Station, Metro Line 2 and up and down are all extended operation 05 hours, doors open 10 minutes early on February 18. 7 bus routes to increase capacity.
Beijing Chaoyang Station, Dongfeng Beiqiao Station of Metro Line 14 will be extended for 15 hours, 1 hour for downlink extended operation. The bus increased its investment in transportation capacity and continued to add 10 buses, bringing the overall allocation to 140. Night No. 13 increased the transport capacity, increased the number of buses issued from Chaoyang Station, and strengthened the capacity of connecting to the East Third Ring Road through Shilipu and Hujialou to Dongdaqiao.
The subway Capital Airport Line will operate for 1 hour later; The Daxing Airport Line of the Metro is in delayed operation 15 hours. Metro Line 19 and Daxing Airport Line synchronous linkage delay; Airport buses have increased their capacity and played a role in providing support.
According to the passenger flow, the "seven stations and two games" also increased the "checkpoint" transportation of taxis and online car-hailing, and encouraged platforms and enterprises to take incentives to guide drivers to operate at the stations.
Reporter Pei Jianfei.
Edited by Liu Qianxian.