How to leave the toilet sewer pipe access opening

Mondo Home Updated on 2024-02-17

The access port of the sewer pipe in the bathroom of the self-built house is set up to facilitate future maintenance and repair, especially when the sewer pipe is blocked or other problems, the access port can be used as an entrance to quickly solve the problem. Here are some tips on how to leave access openings:

1.*Location Selection**: The access port should be set in a convenient location for operation, usually in the vertical part of the sewer pipe, about 1 from the groundAbout 5 meters, so that it is convenient to use tools for dredging. At the same time, the access port should be located in a place that is susceptible to water splashing, such as a shower area.

2.Waterproofing: Waterproofing of access openings is important to prevent moisture from seeping into the walls or floors. When installing the access port, you should ensure that a waterproof layer is done around it, and waterproof rubber rings and sealing materials can be used to ensure tightness.

3.*Access Cover**: The access opening should be equipped with a removable cover so that it can be opened quickly if needed. The cover should be designed to be easy to open and close, and should be flush with the wall when closed, without compromising aesthetics.

4.*Avoid cross-contamination**: If the access port is located inside the restroom, make sure that it is not located in a position that crosses with water sources such as shower areas, wash basins, etc., to prevent water from spilling into the access port.

5.Safety Considerations: Access openings should be designed to be sturdy enough to withstand the pressures that may arise during daily use. At the same time, it should be ensured that the access port will not be accidentally opened when it is closed, so as not to cause potential safety hazards.

6.*Reserve space**: When decorating, you should reserve enough space for future maintenance. If the access opening is located inside the wall, make sure that the wall is thick enough that part of the wall can be removed for access if needed.

7.*Professional Consultation**: During the design and construction process, it is recommended to consult with a professional plumbing engineer or architect to ensure that the access hatch is set up in accordance with local building codes and safety standards.

8.*Maintenance Record**: After the construction is completed, the location and related information of the access port should be recorded, so that it can be quickly found during future maintenance.

In short, the setting of the access port should take into account the practicality, aesthetics and safety, so as to ensure that it can be easily maintained and overhauled in the future without affecting the overall use and aesthetics of the toilet.

Related Pages