How to install stainless steel air shower?

Mondo Home Updated on 2024-02-24

How to install stainless steel air shower?

Stainless steel air shower is one of the common equipment in clean rooms, which is used to remove dust and microorganisms from the surface of people or items, so as to ensure the cleanliness of the clean room. Here are the steps and precautions for installing a stainless steel air shower:

1. Preparations.

1.Confirm the size and installation location of the air shower, and reserve the openings and embedded parts according to the requirements of the drawing.

2.Clean the floor and walls to ensure a clean and tidy installation environment.

3.Have installation tools and materials ready such as screwdrivers, drills, expansion screws, sealants, etc.

2. Install the air shower chamber box.

1.According to the size of the box and the size of the reserved opening, draw the outline of the installation position on the wall.

2.Use expansion screws to secure the box to the wall to ensure that the box is flat and secure.

3.Connect the power cord in the cabinet to the control system to ensure that the wiring is secure and secure.

3. Install nozzles and high-efficiency filters.

1.According to the size of the space in the box, select the appropriate number of nozzles and fix them on the installation position inside the box.

2.Install the HEPA filter on the top or side of the box to ensure a secure, flat installation.

3.Adjust the angle and height of the nozzle to ensure that the blowing effect is uniform and there are no dead angles.

Fourth, debugging the air shower room.

1.Turn on the power switch and check whether the indicator light in the air shower room is on normally.

2.Adjust the temperature and humidity in the air shower chamber to ensure that the process requirements are met.

3.Test the blowing effect of the air shower room to ensure that the blowing area is uniform and there is no dead angle.

4.Check that the access control system is working properly to ensure smooth entry and exit of personnel.

5.After the test, the air shower is closed and waiting for official use.

5. Precautions.

1.During the installation process, the airtightness of the air shower should be ensured to prevent the external polluted air from entering the clean room.

2.After the installation is completed, the air shower room should be fully inspected to ensure the normal operation of the equipment.

3.During use, the air shower room should be regularly inspected and maintained to ensure the long-term stable operation of the equipment.

4.For workshops or laboratories with anti-static requirements, anti-static stainless steel air showers should be selected, and anti-static nozzles should be used.

Related Pages