InThe R&D cycle is tightNumber of concurrent projects is straight**in the backgroundTrial sample testing - verification report writing - optimization decision analysisEvery step of the way is a pain for the engineer.
Lack of system management
EngineerThe moment of collapse when the group was slammed @
@测试主管:Detection protocolsbasisofIndustry specification documentsWhich is it? TestingThis parameter is missingThe test conditions are unqualified, do not meet the requirements of the system, give me a retest!
Hear from the test supervisor.
There are so many industry specification documents, the information required for query is too slow, and the subtle parameters that need to be tested Detection conditions, who remembers so much? There are so many test items in the same period, and I can't control the test process and get irritable.
@数据分析师:A product has been inspected several timesData analysis reportsWhy hasn't it come out yet? Follow-upOptimization suggestionsWhat is it?
Hear from analysts.
Do you also know that after testing several times, the return data is inconsistent, and the feedback data is incomplete and not supplemented, so you urge the report to be urgent? There are still a bunch of pending reports for the same period of testing, so let's wait.
@qc Inspector:There is a problem with the xx part of the xx batch, quickly stop the relevant personnel, and the parts that have been produced should not be used again!
Hear from the inspectors.
The parts have long been mixed together, don't use them.
The leader saw the quarrel in the group and gave a work order to the engineer with an annual salary of one million:
The engineer made a PPT overnight, indicating that the key problem of the company is the lack of oneIndustry inspection execution analysis system
Experimental merit
Focus on the testing field of subdivided industries.
forNew energy, new materials, chemical industry, injection molding industry, formula enterprises
Provide comprehensive, convenient, efficient and lightweight digital intelligence solutions.
withdatawithAlgorithmsEnabling inspection and testing.
From new product development test inspection.
Collaborative management of the whole process from mass production quality inspection.
Assist enterprises in compliance testing and effective excellent inspection
After listening to the engineer's report, the leader gave instructions for the next step.
So the engineer combined the quarrel incident in the group and let the test give a specific solution
Experimental optimization helps test supervisors plan planning
The test will encapsulate a large number of industry testing project plans and reference documents into the system and testersSimply enter the test object, test item name, and special requirementsIt willAutomatically generate test protocolsand show their counterpartsBasis for detection
The test leader is scheduled for the best test test
Test supervisors can use Test Advantage in real time when assigning test tasksMonitor the status of equipment and personnel, and inquire about personnel qualifications and skills, make sureTasks are scientifically assigned to specialized personnel and the right equipment。Based on data, it helps enterprises optimize resource allocation, which is effectiveReduce the cost of testing
In view of the problem that the test progress is difficult to control, the "progress dashboard" of the test can allow users to query the project details from different perspectives of personnel, tasks, and equipment, accompanied by "abnormal reminders" and "message notifications".Information about tasks and progress is transparent to the entire team
Empower data analysts to automatically generate trial reports
Multi-dimensional experimental analysis gives optimization suggestions
Manual report writing is time-consuming and error-prone, and the report format is difficult to unify. After the test is optimized, the system outputs the test dataInspection reports can be automatically generated based on standard report templates, not only the test data results are clear at a glance,Multidimensional assay analysisNo problem.
Cooperate with QC inspectors to trace the inspection data
The test plan will be "planned to test the protocol determined."Test scenariosandDispatchThe tester operates on a task-by-task basisTest dataBuildTest reportAccording toData analysis resultsGive optimization suggestions" The whole process is transferred online andPartition retention information。Once there is any problem that needs to be traced, it is natural that it can also be quickly retrieved from different regions.
Test and test to help you become an engineer with an annual salary of millions
When we compare the before and after employees using the test test, the results will be produced in the figure below
The test not only perfectly solves the specific problems of the relevant personnel of the test and inspection, but also has a simple and convenient operation mode.
TA does not need to be installed, onlyYou need to open WeChat, you can manage experiments anytime, anywhere, and improve work efficiencyBring a whole new experience to your trial management