The 36 year old electric dragon can hold the pen firmly and climb the electric pole

Mondo Social Updated on 2024-02-14

Changsha Evening News reporter Zhou Bin.

Dai Ming, born in September 1988, is a member of the middle school, has participated in the work for 13 years, has been engaged in the front-line work of electric power for 13 years, and is a senior technician, engineer, a construction engineer, a cost engineer, and a national supervision engineer.

From February 6th to 9th, an unexpected low temperature weather swept through most of Hunan. The low temperature weather not only hinders traffic travel, but also brings great difficulties to the safe and smooth operation of power lines.

However, Changsha residents found that electricity consumption for work and life was basically unaffected.

To achieve such an effect, on the one hand, the relevant departments at all levels attach great importance to it and introduce effective preventive measures in advance; On the other hand, it is the result of the continuous struggle and timely troubleshooting of the majority of power front-line support personnel.

Dai Ming is the representative of these front-line ordinary power security personnel.

From the 6th to the 9th, my colleagues and I fought on the front line of anti-icing and power protection for 4 consecutive days. Dai Ming, who had just finished his Spring Festival holiday on duty on the 13th, was interviewed by reporters.

As the person in charge of the on-site work, he led the team members to ensure a total of 4 10,000 volt line power supply, rain, snow and freezing weather, the need to uninterrupted cutting of branches near the line, effectively ensuring the safe operation of the power line, as a young party member and "power wind and snow night return", adhering to the purpose of serving the people, dedication and responsibility, for several days in the freezing and bad weather on duty, to ensure the safe use of electricity by 100,000 residents in the jurisdiction.

During the period of anti-freezing and power supply, when you are sleepy and tired, you will take a nap at the construction and power protection operation site, and when you are hungry and thirsty, you will take a few bites of cold rice after the work is completed, just to take out more time to ensure the power supply of residents. Dai Ming's words were plain and simple. In his mind, it is a professional responsibility to be dispatched at any time to ensure the safety of users' electricity.

Over the years, Dai Ming has been rated as a senior technician, engineer, first-class constructor, first-class cost engineer, national supervision engineer, etc., which is a clear proof of his continuous learning and improvement.

As a young party member and an electric power employee, you must not only hold the pen steadily, but also climb the electric pole. Dai Ming said.

New Year wishes. Dai Ming: I wish every power user a smooth and safe year; May my baby daughter grow up happily; May my family be healthy and happy.

Related Pages