Time is set! Rebuild the Yinghe sluice, located here

Mondo Social Updated on 2024-03-07

The Yinghe Fuyang Gate, commonly known as the Yinghe Gate, is located in Yingdong District, Fuyang City, Anhui Province, China, and is a water conservancy project with a long history. However, with the development of the times and the evolution of the city, the Yinghe sluice has been unable to meet the standards and needs of modern water conservancy projects. In order to solve the problem of the existing sluice gates and improve the flood discharge capacity of the river, the plan for the reconstruction of the Yinghe sluice gates has been finalized recently. This article will comprehensively demonstrate the importance and necessity of the reconstruction project of the Yinghe Gate by describing the problems of the sluice gates, the location and plans of the reconstruction works.

According to the relevant announcements, the existing Yinghe sluice belongs to other large sluices, but its designFloodingThe standard is only once in 20 years, checkFloodingThe standard is once in 50 years, which cannot meet the requirements of the specification. In addition, the place where the gate is located is the central area of the groundwater overexploitation funnel in Fuyang City, which leads to serious settlement and brings hidden dangers to the safety of the project. In addition, the location of the gate is located in an important part of the central urban area connecting Yingzhou District and Yingdong DistrictTransportationchannel, withTransportationbridges combined, while vehicles passing through can adversely affect the gates and bridges. TransportationThe limited passing capacity of the bridge leads to:TransportationCongestion is becoming more and more prominent, which is not conducive to the development of cities.

In order to solve these problems, the reconstruction project of the Fuyang Gate of the Yinghe River aims to eliminate the safety hazards of the existing sluice, improve the flood discharge capacity of the river, and integrate the main stream of the Yinghe RiverFlood controlThe bar is raised to a once in 50 years.

According to the announcement, the new Yinghe Fuyang Gate will be built 220 meters downstream of the existing old gate. The classification of the project is equal toFloodingThe standard will be a once in 50 years by design. The total construction period of the project is 40 months, spanning four years, with construction preparations starting in March 2024 and expected to be completed in June 2027.

The upper part of the new gateArchitectureIt will include the left and right shore bridgeheads andHoistroom, is a multi-functional complex. The bridgehead will be arranged on both sides of the lock chamber, next to the flood control road. ArchitectureA four-story frame structure will be adopted, with a diesel generator room, a high-voltage distribution room and a flood control warehouse on the first floor; The second floor is a low-voltage distribution room, office and other auxiliary rooms; The third floor is the flood control duty room, office, and control roomHoistHouse; The fourth floor is the dispatch room and the data archive room. ArchitectureThe area is about 3500 square meters. The height of the buildingIt will be based on professional requirements such as hydraulic engineering, electrical and specificArchitectureThe programme was appropriately adjusted.

After the completion of the new gate, the old gate will be demolishedTransportationBridge. for recoveryTransportationchannel, according to FuyangUrban planning, a high-grade city will be built near the new gateTransportationbridge, the construction of which will be carried out byTransportationThe department is responsible and is not within the scope of this project.

By rebuilding the Fuyang Gate of the Yinghe River, the existing problems of the existing sluice can be solved, the flood discharge capacity of the river can be improved, and the local urban development and the safety of people's lives and property can be protected. The project plan has been finalized and preparations for construction will begin this month and be completed in June 2027. This marks that Fuyang City's water conservancy undertaking has entered a new stage and laid a solid foundation for the sustainable development of the city.

In short, the importance of rebuilding the Yinghe sluice is self-evident. By renovating existing sluices to solve their existing problems and rebuilding them in appropriate locations, the safety and functionality of water conservancy facilities can be improved and the development of the city can be promoted. This is an important project that requires long-term planning and comprehensive consideration, and is of great significance to the development of Fuyang City and the Yinghe River Basin. It is believed that in the near future, the new Yinghe Fuyang Gate will bring more convenience and safety to the lives of local people, and make greater contributions to the sustainable development of the city.

Related Pages