First, the construction preparation stage.
1.Design approval: Before the construction of the project, the design approval of the relevant departments is required to ensure that the design scheme meets the national and local building standards, environmental protection requirements and safety regulations.
2.Material procurement and inspection: select building materials that meet the standards and carry out strict quality inspection. At the same time, it is necessary to ensure the reliability of the materials to prevent inferior products from entering the engineering construction process.
Second, the construction process control.
1.Construction site management: Establish a strict on-site management system, including a safety production responsibility system, a civilized construction system, etc., to ensure the safety and order of the construction site.
2.Construction technical requirements: follow the relevant construction technical specifications, such as pipe connection methods, welding processes, anti-corrosion treatment, etc., to ensure that the quality of the project meets the expected goals.
3.Construction progress control: formulate a reasonable construction schedule, reasonably allocate human resources and materials, and ensure that the construction of the project is completed according to the predetermined plan.
3. Completion and acceptance stage.
1.Self-inspection and mutual inspection: The construction unit shall organize relevant personnel to conduct self-inspection and mutual inspection of the completed project to ensure that the project indicators meet the standards.
2.Supervision and acceptance: The supervision unit inspects the completed project to ensure that it meets the design requirements and technical specifications. If there is a problem, it needs to be rectified in time until it is qualified.