The scope of demolition includes ceiling, glass, flooring and other decoration materials, old air conditioners, old access control, old ** monitoring, environmental control equipment, power equipment, strong and weak current lines, etc.
Dismantle the preliminary preparations, cut off all power supply in the machine room, ensure the safety of the working environment, mark the location of the pipeline, and prevent damage. Decoration and demolition are carried out in the order from top to bottom and from outside to inside, and the decoration of walls, floors, ceilings and other decorations should be removed, and attention should be paid to avoid damaging the building structure. Device removal starts by powering off the device, backing up data, and then removing peripherals, servers, storage devices, etc. Line removal should first remove non-power lines, and then remove power lines, all lines should be clearly marked for later installation. At the same time, it is necessary to do a good job of sorting and disposing of garbage that can and cannot be done to keep the environment clean and tidy.
All demolition processes should be standardized, follow the relevant building decoration specifications and electronic equipment installation specifications, ensure the quality of demolition work, ensure that operators wear safety protective equipment, such as gloves, goggles, etc., stay vigilant during the operation process, avoid accidents, and try to avoid damage to the equipment during the demolition process, ensure its integrity, keep the room clean, avoid dust, and affect the quality of later decoration.
In the process of demolition to do a good job of protection, equipment, walls, ground, etc., in the process of demolition, it is easy to be damaged by bumps, we will use soft materials (such as foam, cardboard, etc.) to wrap the equipment to prevent bumps, for the wall and ground, we will cover with protective film to reduce the scratches and impacts generated during the demolition process. For equipment that needs to be removed, we will pack it appropriately according to its size and shape to prevent damage during shipping, and for some large equipment, we will set up isolation measures around it to prevent other items from falling or crushing the equipment.
Set up a temporary fence around the computer room to ensure that the operation area is isolated from the outside world, and the fence should be made of strong and durable materials, such as steel, wooden boards, etc., to ensure safety, entrance management, set up a unique entrance channel, and strictly manage the personnel and materials entering the operation area. Safety education is provided to those entering the venue and they are required to wear the prescribed protective equipment. Closed management: Adopt a closed management mode to strictly control the entry and exit of personnel, as well as the registration and management of the entry and exit of equipment and materials.
In addition to the finished product protection and construction enclosure, there are some other protective measures to pay attention to, such as dust-proof treatment, etc., in the process of demolition, a large amount of dust and waste will be generated, and effective dust-proof measures should be taken, such as using vacuum cleaners, sprinkling, etc., to reduce the diffusion of dust and the impact on the environment.