Precautions for cross-crossing turnouts are as follows:
In the process of operation, it should be carried out in strict accordance with the regulations, and the original safety measures should not be changed without permission. Regular inspection and maintenance of on-site equipment should be carried out; If there is an abnormal situation, it should be dealt with and repaired in time. Do not allow damaged or non-compliant implements to enter the work area to ensure the safety of personnel and avoid further losses.
The bedage must always be kept tidy, especially during the rainy season. If it is necessary to use large formwork to support rail rutting forks and ballast on the business line for special reasons, it is necessary to pay more attention not to affect the adjustment of the train schedule
Adjustments should be made to the external line section (including the approach connecting to the station signal interlocking equipment) under the command of a skilled management personnel to ensure driving safety. ?
For the crossings and pole holes under the jurisdiction of other departments, it is also necessary to strengthen the protection and set up special personnel to be responsible for management to ensure the safety and smooth flow of trafficIt should be noted that the event can only end after the tools are cleaned up and the venue is restored to its original state after the temporary signs are removed. Every construction worker must keep these things in mind in order to keep themselves and others safe while improving their productivity. Hope the above information is helpful to you!