In February 2024, the national water conservancy and hydropower projects will be opened in a centralized manner, with the winning bid amount as high as 134.4 billion yuan, and the number of projects exceeding 140,000. Among them, Sichuan, Guangxi, Anhui, Inner Mongolia, Guangdong, Shandong, Hebei and other regions ranked among the top in terms of winning bids.
The largest water conservancy project in February was the first batch of construction bids for the Guangxi Water Resources Allocation Project around the Beibu Gulf, and the project was divided into 5 bids in this phase. The task of this project is to supply water to urban and rural life and industry in key cities such as Nanning, Qinzhou, Beihai and Yulin, improve the ability to guarantee water supply security, and create conditions for improving agricultural irrigation and water ecological environment. The design flow rate of the first part of the Nafeng trunk line of this project is 250m3 s, the design flow rate of the head of the Nanning (Binyang) trunk line is 55m3 s, the design flow rate of the first part of the Qinzhou trunk line is 50m3 s, the design flow rate of the first section of the Yujiang South Trunk Line is 350m3 s, the design flow rate of the head of the Beihai Trunk Line is 216m3 s, the design flow rate of the head of the Yulin trunk line is 120m3 s, the project level is equal, and the project scale is large (1) type.
The Fourth Bureau of Hydropower ended with 20500 million yuan won the bid for the D1 bid section of the first batch of construction bid construction projects of the Guangxi Water Resources Allocation Project around the Beibu Gulf, and won the highest amount of water conservancy and hydropower projects in February 2024, showing the outstanding strength of the Seventh Hydropower Bureau in the water conservancy and hydropower market.
The second is the A2 bid section of the first batch of construction bid construction projects of Guangxi Water Resources Allocation Project around Beibu Gulf, and the winning bidder is China Railway 18th Bureau Group. The winning bid amount is 168.6 billion yuan.
The third is the EPC general contracting project of Yangjiang Offshore Wind Power Intensive Operation and Maintenance Center Base, and the winning bidder is the consortium of China Construction Fourth Bureau, China Communications Fourth Harbor Bureau Survey and Design Institute, and China Xinxing Construction Company. The winning bid amount is 137.1 billion yuan.
The fourth is the D2 bid section of the first batch of construction bid construction projects of Guangxi Water Resources Allocation Project around Beibu Gulf, and the winning bidder is the consortium of the Fifth Hydropower Bureau and China Railway Tunnel Bureau, with a bid amount of 134.1 billion yuan. Engineering people