The installation knowledge of the primary effect plate air filter is introduced as follows:
1. Before the operation of the equipment, it is necessary to check whether the model, specifications and accessories of the equipment are complete. At the same time, it is necessary to confirm that the various interfaces are well sealed and can be closely connected together; It is also necessary to inspect and start up the fan to ensure that it is working properly.
2. Place the bracket or fixing parts in the predetermined position according to the design requirements, and then put the filter screen assembly on it and place the filter frame firmly with screws and other fastening devices;
3. Follow the steps in the instruction manual provided by the manufacturer, and pay attention to read the relevant instructions to understand the correct usage methods and precautions;
4. Appropriate adjustments should be made to the environment of different places, such as the size and distribution of tuyeres, and other factors should be adjusted to ensure their normal use;
5. Do a good job in daily maintenance and maintenance, clean up dust in time, replace damaged parts, etc., to ensure normal operation and extend service life;
6. Regularly test the product performance indicators, observe the changes between the resistance drop and the initial resistance, and compare and analyze the aging degree of the product;
7. For large and medium-sized computer rooms, a sound inspection system should be established for dynamic management to ensure the stable operation of the system and meet the requirements of the production process.
The above is the relevant information about the assembly method of the initial effect board, I hope it will be helpful to you!