Good news!The northern section of Metro Line 17 will open this weekend for initial operation.
The northern section of Line 17 (North of the Future Science City - Workers' Stadium) is about 24 years long9 km, 5 out of 10 stations are interchange. Among them, the Workers' Stadium Station and Line 3 are T-shaped node transfer stations, and the two line station halls are connected on the same floor, and the platform transfer stairs of Line 17 and Line 3 are set up to realize the double transfer of the station hall and platform, with a transfer distance of about 200 meters and a transfer time of about 3 minutes.
After the line is opened to traffic, it will only take 31 minutes to reach the Workers' Stadium in the north of the Future Science City, which will further connect key residential areas such as the Future Science City, Tiantongyuan and Wangjing West, and greatly improve the regional rail transit service capacity of the Huitian area and the future Science City.
The northern section of Line 17 has an integrated design of 5 stations.
Beijing's Urban Master Plan (2016-2035) clearly proposes to "strengthen the integrated planning of rail transit stations and surrounding land and the comprehensive utilization of station land, improve the level of comprehensive development and utilization of passenger transport hubs, and guide the organic integration of transportation facilities and various urban functions." ”
It is understood that the northern section of Line 17 is closely integrated with the surrounding plots, and 5 of the 10 stations have been integrated to enhance the convenience of station transfer and improve the passenger experience. Among them, the Future Science City Station and the Future Science City North Station have realized the perfect integration of the track and the city, and the main body and ancillary parts of the station are in the development plot to achieve integrated integration.
Off-site bus connections and shared bicycles are ready.
Pingping learned from the District Transportation Bureau that according to the new track work plan at the end of 2023, Tiantongyuan East Station of Line 17 has 6 connecting lines 432, 530, 119, 58, 301, and 26;In order to solve the problem that there is no bus connection at the future Science City Station of Line 17 and the north of the Future Science City, the District Transportation Bureau and the Public Transport Group have carried out route research work, and formulated an off-site connection plan based on the surrounding lines. The bus group organizes on-site surveys by drivers of the feeder lines to familiarize themselves with road conditions and signal light signs.
1) The connection plan of the future Science City North Station.
Combined with the existing bus lines and road conditions around the future Science City North Station, the route of Route 487 was adjusted, and the connection of the future Science City North Station (two-way) was realized by adding a new station (two-way) station on Yingcai North 1st Street Road, and at the same time, in order to ensure the travel of existing bus passengers along Route 487 to move the existing station, the future Science City Road Station (two-way station) on the future Science City Road was moved to Yingcai North 2nd Street, and a new platform was added on Yingcai North 2nd Street. (as shown in the image below).
Schematic diagram of 487 channel adjustment.
2) The connection scheme of the future Science City station.
Combined with the existing bus lines around the future Science City Station, the subway connection of the station will be realized through the new station of No. 417 (Metro Future Science City Station). New feeder bus stop (northbound). (as shown in the image below).
Schematic diagram of No. 417 plus station.
Transfer and connection: The underground parking lot of China Resources Project can provide 140 parking spaces for temporary transfer and connection at North District Station.
Bike-sharing situation: On December 29, three bike-sharing companies (Meituan, Qingju, and Harrow) launched 100 bike-sharing bikes at two stations in the North District Station and the South District Station, with a total of 600 bike-sharing bikes to solve the "last mile" problem.
The subway shuttle bus of the future Science City Park will be opened soon.
In order to facilitate the commuting of future Science City partners, the Future Science City Industrial Company will open a free subway shuttle bus for employees of office buildings in the park to ensure the "last mile" commuting. The shuttle bus will start operating on the first working day after the subway is opened, and the specific operating routes and departure times are as follows:
Future Science City Station to and from Future Center.
Note: Exit B is Exit B of Future Science City Station.
Future Science City Station - Future Center.
Departure time: 7:50-8:50 a.m. on weekdays, every 15 minutes, punctual departure: 50).
License plate number: 京AAU150
Note: Future Center Station is the road on the west side of Block B of Future Center.
Future Center - Future Science City Station.
Departure time: 17:40-19:40 on weekdays, every half hour, on time: 40).
License plate number: 京AAU150
Future Science City North Station to and from Future Vision.
Note: Exit C is Exit C of the Future Science City North Station.
Future Science City North Station - Future Vision.
Departure time: 7:50-8:50 a.m. on weekdays, every 15 minutes, punctual departure: 50).
License plate number: Beijing A35067D
Note: Future Vision Station is the road on the east side of Future Vision Building 3.
Future Vision - Future Science City North Station.
Departure time: 17:40-19:40 on weekdays, every half hour, on time: 40).
License plate number: Beijing A35067D
Free Ride Process].
1. Long press to identify the *** pay attention to *** future service number below", free ride;
2. Click on the bottom navigation bar "Park Services" and "Subway Shuttle" After completing your personal information, open the bus line, click on the "boarding code" to scan the code, and get on the bus after hearing the "Welcome to ride" prompt.
See below for the specific ride process**.
Tips. Please fill in your personal information in advance before getting on the bus, so that you can scan the QR code directly to take the bus.
Beijing Changping WeChat***