Estimated price of the bid contract: 104883553513 million yuan.
The content of this bidding: the EPC general contracting project of the masonry and repair pond photovoltaic power generation project (phase II), including the preparation and approval of various special reports, survey and design, equipment procurement of photovoltaic field area, construction and installation engineering, 35kV collector line and a new 220kV booster station, ecological vegetation restoration and other services at the project site.
The main work includes but is not limited to: in accordance with the relevant national and industry laws, regulations, rules and regulations, to carry out the preparation and approval of various special reports of photovoltaic projects (including all special articles except for project proposals, feasibility study reports, access system design, and 1:500 topographic map surveying and mapping). Carry out all construction drawing survey and design within the red line of the land handled by the tenderer, except for the equipment (see the technical requirements in the bidding documents for details) and material procurement, engineering construction, project management, preventive testing, system commissioning, network-related tests (in accordance with all the tests required by Yunnan Provincial Power Grid Company), trial operation, elimination, training, acceptance (including various topics, stage acceptance, completion and other acceptance), transfer to production, Standard production acceptance, performance and quality assurance, production preparation related work and engineering quality warranty period services, etc., but also includes the warranty period of all special tools procurement and related technical data collation and services, grid connection procedures, scheduling and power supply procedures, temporary land acquisition coordination during the construction period, local relations coordination and undertake relevant cooperation and assistance work, etc., excluding the owner unit in accordance with the requirements of the local ** or administrative departments to pay administrative fees separately.
The first winning candidate: China Power Construction Group Zhongnan Survey, Design and Research Institute***
Bid** (10,000 yuan): 96757126272
The second winning candidate: China Power Construction Group East China Survey, Design and Research Institute***
Bid** (10,000 yuan): 99919938007
The third winning candidate: China Power Construction Group Kunming Survey, Design and Research Institute***
Bid** (10,000 yuan): 103883030853