Take stock of the decoration company s quotation routine, and the quotation is 100,000 and the actua

Mondo Home Updated on 2024-01-19

1. Demolition

1.Sweeping.

*Only the cost of demolishing walls, doors and windows is reported, and the cost of demolition of the whole house is not reported. When the demolition is almost done, start charging one by one, such as floor removal, sanitary ware dismantling and other additional repair items are also charged by the meter.

2.Garbage removal freight.

After the demolition, the house is full of garbage, and there is no way to construct it, at this time, the construction party will sit on the ground and raise the price, so that you can spend a lot of money to ask them to remove the garbage. A car ranging from a few hundred will be priced from the ground, and a few cars will come down, and ** will also be thousands.

2. Hydropower

1.Hydropower** are estimates.

If the preliminary audit is not careful, the point is not planned, the temporary addition, the worker secretly winds you, the use of inferior materials to replace the process in the later stage, and the rectification in the later stage, etc., are a lot of money.

2.When measuring and calculating money, there is more quantity and more calculation.

At the end of the hydropower project, many foremen like to calculate more than they do, and if they don't calculate on the spot, it is easy to be cheated a lot of money. Therefore, whether it is ** or acceptance, you must measure it on the spot by yourself!

3.Bright lines collect money from dark slots.

Water, circuit transformation is clearly installed, concealed installation will charge an extra slotted money, some decoration team also subdivided the slotting ** into "concrete wall slotting brick wall slotting" two kinds of **!Many foremen finally calculate the money, and if they don't slot, they will calculate it according to the slotting, and the brick wall slotting will be calculated according to the concrete slotting, and the black owner will make money.

4.The material of the wires and water pipes is not indicated.

With cheap materials, you can't see it even if you hide it. In order to reduce costs, some manufacturers will dope calcium carbonate into PPR pipes to make them shoddy. **See the brand of water pipes and wires clearly in the list, and pay close attention to the construction site when you buy it yourself.

5.**The process is not indicated.

If there is no corresponding standard process and acceptance standard, it is easy for workers to seize the loophole and deliberately use more materials or less materials.

3. Bricklayers

1.Brushed walls.

Brushing is a construction method that is mainly used before tiling to make the wall rough, because the smooth wall does not stick to the tile. Therefore, the renovation company will deliberately omit it from the budget and wait until the masonry stage to charge extra.

2.Waterproof floor beams in the bathroom.

In order to prevent the wall from damping, the new wall of the bathroom needs to be dyed waterproof, but if there is no single one, if you want to do it, it is a personalized ticket, and one flat is almost one or two hundred.

3.The process or practice is not clearly stated.

*The list is standard**, if you want to change the material or process, **there is no on the list, it will be charged indiscriminately, **inflated.

4.Wrap riser.

The risers of the bathroom, kitchen, and balcony are not good-looking when exposed, especially the sewer pipes in the bathroom will be very noisy. Renovation companies often miss out on these small and inconspicuous items.

Fourth, carpentry

1.Change process = overcharge labor costs.

When laying the floor, the carpenter told you that the ordinary paving is not good-looking, and asked you if you want herringbone or fishbone spellingA flicker. As a result, I was overcharged twice the labor cost!

2.Install door stacks, window covers, and flat mouths.

These wooden construction processes that play an aesthetic role are generally not included in the **, and it is necessary to communicate with the decoration company in advance about the pricing method, and calculate it according to the actual size of the user.

3. Suspended ceiling**.

Suspended ceilings are calculated according to the area**, and multi-storey complex ceilings will charge extra money.

4. Gypsum line**.

Many of them are a price for a single-layer gypsum line and a price for a multi-layer gypsum line.

5. a curtain box.

The curtain box is generally customized together with the ceiling, which must be planned in advance and reflected in the ** list, and the temporary curtain box will not only delay the construction period but also be increased.

5. Oilman

1.The more colors you charge, the more you charge.

When painting the wall, in order to pursue the change of space, the designer will suggest a collage of contrasting colors. If you do not note the color and type of paint in advance, then one more color will charge a lot more labor costs in the later stage.

2.The brand and model of the material are not clear.

In the remarks, it was written that Nippon's latex paint did not indicate the model, and the price difference was large.

3.The process is not clear.

For example, gypsum leveling is divided into two types, 18 25 yuan square meters and 30 35 square meters. Shunping is flat along the wall, the whole wall is flat, it is enough to do Shunping, and the vertical must also be perpendicular to the entire wall and the ground, which mainly affects the degree of seamless fitting of customized furniture. Vertical leveling can be done with money in a local position, but the premise is that ** list should be clearly listed**.

6. Main materials and auxiliary materials

1.There are only brands, no models.

When the all-inclusive company ** list, it will only simply list one brand, such as Dulux for latex paint and Ounuojia for shower. At first glance, it seems that the quality of the big brands is guaranteed, but in fact, the same brand is very different, and the decoration company takes the low configuration and old style in the brand store, and some use high imitations.

2.There are mixed cards in the big cards.

Before signing the contract, the sales will take you to the model room to visit, and tell you a bunch of big brands, in fact, a bathroom may only have wine is a big brand, and the rest are unknown miscellaneous brands, and it is also a beautiful Japanese enterprise special payment!

7. Other common routines

1.Poor routines.

Because the budget table of the decoration company does not allow the lottery to be taken, the decoration novice can only remember a few more common items**.

2.Project management fee.

The project management fee is an IQ tax, accounting for about 5%-10% of the project price, which belongs to the net profit of the decoration company. It is said to ensure the quality of the project, but this is the decoration party's own project, let the consumer pay the management fee for you to guard and steal?