300,000-level purification workshop decoration and construction standards, Liaoning LG Construction said that the decoration and construction of 300,000-level purification workshop refers to an industrial building decoration that meets the requirements of 300,000-level purification. According to different scenarios and requirements, there are many different modes of purification workshop decoration, such as operating rooms, laboratories, clean workshops, etc. No matter what type of purification workshop decoration, it has the following characteristics:
1.Stable internal environment: The clean room needs to maintain constant temperature, humidity and air quality to ensure the stability and controllability of the working environment.
2.High-efficiency filtration device: The decoration of the purification workshop adopts high-efficiency filter and air flow organization design, which can filter harmful substances such as fine dust, bacteria, and viruses in the air and provide a clean working environment.
3.Adequate ventilation system: The decoration of the purification workshop needs to be equipped with a proper ventilation system to ensure the circulation of indoor air and fresh air.
4.Strict sealing: The decoration of the purification workshop needs to have a good closure to prevent external pollutants from entering the room.
5.Reasonable layout: The layout of the facilities in the purification workshop should be reasonable so that employees can work efficiently.
The design scheme of the decoration of the purification workshop needs to be determined according to the specific situation, and the following are some common design points:
1.Decide on the type and number of purification equipment, such as filters, air purifiers, etc., according to the purification level.
2.Properly designed passages and isolation areas to ensure that the air flow between the different levels of purification areas does not cross.
3.Choose appropriate materials and finishes, such as purifying dust-resistant floors, walls, and ceilings, to provide surfaces that are easy to clean and disinfect.
4.Provide the appropriate lighting and power system to meet the demands of the job.
The construction steps of the decoration of the purification workshop mainly include the following links:
1.Preparation: This includes cleaning and dismantling the site, as well as inspecting facilities such as electrical circuits and plumbing.
2.Installation equipment: According to the design plan, install and debug the purification equipment.
3.Construction of isolation areas: According to the design plan, the isolation of each decontamination area is built and tested accordingly.
4.Completing renovations: This includes installing floors, walls, ceilings, and other finishing materials, as well as carrying out the necessary paints and finishes.
5.Commissioning and testing: Conduct comprehensive testing and debugging of the entire purification workshop to ensure the normal operation of the system.
After the completion of the purification workshop, there are still some important post-management work, including:
1.Organize personnel training: Train operators to ensure that they understand and comply with relevant operating procedures and precautions.
2.Regular maintenance: Regularly maintain the equipment, inspect and replace damaged or aging parts to ensure the normal operation of the equipment.
3.Routine cleaning: Conduct regular cleaning of the purification room to prevent the accumulation of dust and pollution.
4.Regular inspection: Regularly test the environmental indicators of the purification workshop, such as temperature, humidity and air quality, to ensure that the requirements are met.
In short, the decoration and construction of the purification workshop is a very complex project, which requires comprehensive consideration of multiple factors to ensure that it can effectively meet the requirements of industrial production. Hope the above is helpful to you.
Statement: Original article, prohibited without permission**, otherwise legal responsibility will be pursued.