Yaohu Yunba, no play!

Mondo Social Updated on 2024-01-29

As early as March 2020, Nanchang High-tech Zone proposed to promote the field of "new infrastructure" in the cityYaohu Yunbaand other three-dimensional transportation construction, promote high-tech and green travel to meet the needs of enterprises and the masses.

In June 2020, the people of Nanchang City ** withBYD shares***A strategic cooperation agreement was officially signed, and the two sides will cooperate in the field of rail transit and electronicsYaohu Rail Transit Projectand industrial investment projects.

In February 2021, the "Nanchang High-tech Zone Small Volume Rail Transit Demonstration Line Line Plan" was officially finalized.

However, there has been no new progress on the project since then.

Recently, some netizens have consulted on the official website "Will Nanchang build smart rail trains and cloud buses":

May I ask if Nanchang 2024 will build a smart rail train, didn't it say that a smart rail train will be built in 2022, I hope that the construction of Nanchang smart rail train will be restarted in 2024, and there is no news about the Yunba train in Nanchang High-tech Zone.

In this regard, the people of Nanchang City replied:

After verification, Nanchang High-tech Zone and BYD Group have docked the Nanchang smart rail train project in the early stageFor some reason, the promotion has been suspended

Yaohu Yunba planning.

According to the previous plan, the high-tech Yaohu group small volume system adopts the Yunba system. Combined with the spatial structure, passenger flow corridors and passenger flow distribution points, industrial development axes, and matching with rail transit, the Yunba demonstration line is in the form of "inverted U", with a total length of about 27km.

among othersThe first phase of the line starts from Yaohu West Station and ends at Shangfei Avenue Station, about 19 years long2km, with 19 stations, the starting point is connected to Yaohu West Station of Line 1, passing through the aviation city, the north shore of Yaohu Lake, the west bank of Yaohu Lake, and connecting the industrial group around Yaohu Lake.

The second phase of the line extends from the first phase of Shangfei Avenue to the south to Yangqiao Road Station, about 7 years long8km, with 6 new stations, which will mainly radiate the Maqiu area and connect with Maqiu Station, the terminal station of the east extension of Line 1. The line has a depot station, which is located on the south side of Shangfei Avenue Station, covering an area of about 8 hectares.

On June 17, 2020, the people of Nanchang City and BYD officially signed a strategic cooperation agreement, the two sides will cooperate in the field of rail transit, electronics, etc., the signing ceremony includes the Yaohu rail transit project and industrial investment projects, etc., the signed Yaohu rail transit project is the announcement of the high-tech Yaohu group small volume system.

After the completion of the project, the subway lines passing through the high-tech zone will be colluded, which will greatly alleviate the transportation capacity of the traffic trunk lines in the area, improve the transfer efficiency of the Nanchang rail network, and give full play to the integrity of transportation. Key areas such as the Aviation City can meet the commuting needs of each area, provide transportation convenience for industrial development, and promote the introduction of industrial projects in the high-tech zone, further reduce project construction costs, drive the development of surrounding industries, and provide more jobs. In the future, it can also undertake tourism functions for Yao Lake and help the development of tourism in the park.

However, these have been suspended, and we don't know if it will be possible to restart again in the future, what do you think about this?

Related Pages