Most of the smart buildings are high-rise buildings, and their water supply and drainage systems are characterized by the following. There are a large number of people in high-rise buildings, and the requirements for living hygiene and security and fire prevention facilities are relatively strict, so it is necessary to install a water supply and drainage system with a high common standard to ensure the safety and reliability of water supply and drainage. The height of high-rise buildings is large, resulting in greater static pressure in the water supply pipes. Excessive water pressure not only affects the use and waste of water, but also increases the maintenance workload, so the water supply pipeline system, hot water pipeline system and fire water supply system must be vertically partitioned.
According to the characteristics of the water supply and drainage engineering system in the building industry, the project object system design training model is adopted, and the comprehensive ability of water supply and drainage equipment installation and control can be assessed through the operation training of the device, such as pipe cutting and connection, pipeline installation, equipment installation, electrical installation, equipment wiring, programming control, troubleshooting, etc.
QY-LY135 water supply and drainage equipment installation and control training device according to the characteristics of the water supply and drainage engineering system in the building industry using the engineering object system design training model, through the operation training of the device can assess the comprehensive ability of students to master the installation and control of water supply and drainage equipment, such as pipe cutting and connection, pipeline installation, equipment installation, electrical installation, equipment wiring, programming control, troubleshooting, etc. Turn the page in 2023