The construction method of the lightweight engineering explosion-proof wall is like weaving a delicate symphony, and its steps are exquisite and rigorous. First of all, just like laying the foundation for the movement, apply a waterproof layer to the wall to ensure that the wall is fresh and comfortable. Then, the wall pay-off is like marking the notes on the musical score, and the installation position of each keel is determined according to the decoration design and construction drawings.
The wall mat construction is the cushion part of the movement, and the wall mat is laid first to lay a stable tone for the subsequent melody. Then, the keel is laid from the position along the ground and along the top, like the main theme of the music melodiously rising in the indoor space, and the nail pitch is 600mm, like the harmonious spacing between the notes.
The installation of the vertical keel is like the chorus part of the music, after the top keel, according to the specification of the cover panel 900mm or 1200mm plate width, the size of the binning specification is 450mm. In this section, the plaster cover panel should be placed on the edge of the door opening, as if it were to avoid dissonant notes in the movement.
Then, install the vertical keel according to the binning position, and insert the keel along the top keel and the keel along the ground at the upper and lower ends, and fix it with blind rivets after adjusting the vertical and positioning accurately. The keel of the wall and column edge is fixed with nails or wooden screws with the wall and column, and the nail spacing is 1000mm.
For example, in the climax part of the music, when the height of the partition wall is greater than 3m, a horizontal card keel should be added. This step is like adding a rousing melody to the music.
In order to ensure the quality of construction, the concealed project should be recorded in the construction of the explosion-proof wall project, and the intermediate or sub-item inspection should be carried out, just like the harmony and rhythm inspection in the movement, and the construction of the next process can be carried out only after passing the qualification.
AI Assistant Creation Season The above information is for reference only, and the actual construction method may vary depending on the actual situation. Just as the performance of music requires flexibility, it is advisable to consult a professional for accurate information.