Shaanxi Xi'an shopping mall decoration design, supermarket decoration, shopping mall decoration, shopping mall design, shopping mall store decoration design, shopping mall decoration style, large shopping mall decoration, decoration shopping mall, Xi'an tooling decoration, Xi'an Donglang decoration shopping mall decoration.
Shopping mall is a place where people shop and shop, and it is also an area where many bosses start a business and open a store, and the decoration of the shopping mall area belongs to the part of tooling decoration, and the decoration of the shopping mall is much more complex than the design of the interior decoration, which can be compared from the design of the planning. So how to decorate the mall?What are the steps of the shopping mall decoration construction process?Let's take a look at the introduction.
1. Understand decoration design.
Before the decoration design of the shopping mall begins, the designer, the construction party and Party A need to connect the design drawings, and the designer needs to pay attention to the construction points on the drawings and explain in detail to the construction party. In order to avoid the design not conforming to the construction, resulting in losses after the start of construction.
2. Enclosure construction project.
After the project is handed over, the construction team enters the site and the first thing to do is the enclosure of the shop. The fence construction technology must be in accordance with the requirements of the shopping mall, and the materials are generally made of light steel keel and gypsum board cover, and the cover is spray-painted.
3. Demolition project.
After the fence is completed, it is the official construction phase, and the part that needs to be demolished is carried out in this part. When dismantling, it is necessary to pay attention to distinguish which wall is the load-bearing wall, and pay attention to the load-bearing wall cannot be demolished and modified, otherwise it will cause the danger of collapse.
4. Hydropower engineering.
The circuit of the shopping mall is very complex, and the construction must be carried out in strict accordance with the power requirements of the shopping mall. At the same time, the water and electricity material requirements of the shopping mall are also very strict, as the decoration construction party must not cut corners, otherwise the losses caused by the back will be very serious.
5. Masonry engineering.
The hydropower works are followed by masonry workers who come in to lay bricks on the walls and floors. Before laying the floor tiles, the cement and sand of the rough ground should be flattened before paving. Therefore, after the demolition and reconstruction, it is necessary to do a good job in the ground hydropower project.
6. Carpentry engineering.
Carpentry engineering includes the production of sealing boards for ceilings, and attention should be paid to the joints of the ceiling gypsum board and the partition gaps of each partition wall during manufacturing. And reserve a good ceiling access to prevent the edge from being stepped on in the future.
7. Painter construction.
The painter needs to batch the putty before construction, and the screw oil on the plate must be applied to the anti-rust paint before the batch of ash putty, and the joints between the plates must be treated with anti-crack tape to avoid cracks in the later joints.
8. Completion of the project.
After the above projects are done, some details of the project are not in place to carry out the finishing work, the project edge stage must be particularly careful, the need to deal with the problem as soon as possible to solve the problem, to avoid unnecessary trouble in the follow-up.
The content originates from the Internet, only for communication and learning, if there is any infringement, please contact to delete.