On December 28, the Beijing-Xiong Expressway built by the China Railway Beijing Engineering Bureau was officially opened to traffic, and the Fifth Ring Road in the southwest of Beijing was driven to the Xiong'an New Area within 1 hour.
The Jingxiong Expressway (Beijing Section) is 27 kilometers long, and the line as a whole is in a north-south direction, starting from the Southwest Fifth Ring Road in the north, crossing the Yongding River, Fangshan Metro Line and Jingshen Road in the west, and then turning to the south, crossing the Sixth Ring Road, and continuing to extend to the city boundary in the south, connecting with the Jingxiong Expressway (Hebei Section), and the whole line adopts the two-way eight-lane expressway standard for construction. The section from the sixth ring road to the city boundary of the Jingxiong Expressway (Beijing Section) participated in the construction of China Railway Beijing Engineering Bureau has been opened in advance, with a total length of about 11753 kilometers, from the Sixth Ring Road in the north to the city boundary in the south.
In view of the characteristics of the project construction, the project team of China Railway Beijing Engineering Bureau carried out all-round analysis and scientific planning, and organized relevant personnel to divide into multiple roadsThe 10 natural villages in the three towns involved in the 77-kilometer route have been running around, closely cooperating with the local government, establishing a close communication and coordination mechanism, concentrating on making every effort to tackle tough land and promote the relocation work. According to the construction period, the project department raced against time and created 6 first pieces of continuous first pile, first platform, first pier, first cap beam, first prefabricated box girder and first product beam.
*: China Youth Daily client.