Screw grouting machine is a kind of grouting equipment widely used in construction projects, which can be used to deal with engineering problems such as foundation, soil and rock.
Before installing the screw grouting machine, we need to carry out a series of preparations.
1.Determine the installation location: It is necessary to select the appropriate installation location according to the actual construction needs.
Generally speaking, the screw grouting machine should be installed closer to the construction site and ensure that there is enough space for operation and maintenance.
2.Foundation treatment: Before installing the screw grouting machine, we need to carry out the foundation treatment of the installation position.
Clean and level debris and dust from the installation location.
Then, depending on the weight and pressure requirements of the equipment, a solid foundation is laid or reinforced with concrete.
3.Mounting the Fixture: Installing the Fixture is an important step in installing the screw grouting machine.
The selection of the mount should take into account the weight and stability requirements of the equipment.
The holder should be firmly fixed to the foundation, and the device needs to be able to be stably mounted on the mount.
4.Connect the power supply and piping: After the installation of the fixing frame, we need to connect the screw grouting machine to the power supply and piping.
Connect the appliance's power cord to a power outlet, making sure the power supply is properly and reliably.
Then, connect the pipeline of the grouting machine with the concrete conveying pipe or grouting needle to ensure that the connection is sealed and reliable.
5.Confirm the operation steps: After the installation is completed, we need to confirm the operation of the screw grouting machine.
Confirm the position of the start and stop buttons of the equipment and ensure that the operator is familiar with the start and stop procedures of the equipment.
Confirm the grouting speed and pressure adjustment buttons of the equipment and ensure that the operator is able to adjust the grouting speed and pressure correctly.
6.Perform a test run: After completing the above steps, we need to do a test run to make sure the screw grouting machine is working properly.
Check that all connectors of the device are tightened and confirm that there is no water leakage on the device.
Then, according to the requirements of the operation manual, the grouting test is carried out with suitable materials to check whether the grouting effect of the equipment meets the requirements.
Installing a screw grouting machine requires a number of tasks: determining the installation location, performing foundation treatment, installing the fixtures, connecting the power supply and piping, confirming the operating procedures, and performing a test run.
Only when each step is carried out correctly can the screw grouting machine work properly and provide reliable support for the progress of the construction project.