2024 Measures for the Management of EPC Development and Construction of Photovoltaic Power Plants.
Chapter I: General Provisions.
With the transformation of the global energy structure and the vigorous development of clean energy, photovoltaic power stations, as an important part of it, have attracted more and more attention. In order to standardize the EPC (i.e., engineering, procurement, construction) development, construction and construction management of photovoltaic power plants, and ensure the smooth progress of power station construction and the stability of later operation, these management measures are formulated.
Chapter II: Governing Bodies and Responsibilities.
The EPC development and construction management of photovoltaic power plants is responsible for the special EPC project management department, whose responsibilities include but are not limited to: formulating construction management plans, supervising construction progress, ensuring construction quality, coordinating resources of all parties, and dealing with unexpected problems in construction.
Chapter 3 Construction Management Process.
Preliminary preparation: Conduct a feasibility study of the project, clarify the project objectives, scale, technical route, etc., and prepare the project proposal and feasibility study report.
Design and bidding: complete the preliminary design, technical design and construction drawing design of the power station, and carry out the procurement bidding of equipment and materials according to the design results.
Construction preparation: Organize the construction team, make technical disclosure, and ensure that the construction team understands the construction requirements and technical standards.
Construction process: Carry out construction in accordance with the design requirements to ensure the quality and progress of the construction, and at the same time do a good job in the safety management of the construction site.
Commissioning and acceptance: After the completion of construction, the commissioning and trial operation of the power station will be carried out to ensure the normal operation of the power station, and the completion acceptance will be carried out.
Chapter 4 Quality and Safety Management.
Quality management: During the construction process, the construction should be carried out in strict accordance with the design documents and related standards to ensure the quality of the project. At the same time, establish a quality inspection mechanism to conduct regular and irregular quality inspections on the construction process.
Safety management: Safety warning signs should be set up at the construction site, and construction personnel should wear safety protective equipment. Formulate and implement a safety management system on the construction site to ensure the safety of the construction process.
Chapter 5 Post-maintenance and management.
After the completion and acceptance of the power station, a sound post-maintenance and management mechanism should be established, and the power station should be regularly inspected and maintained to ensure the long-term stable operation of the power station.
Chapter VI: Supplementary Provisions.
These management measures shall be implemented from the date of promulgation, and if there are any unfinished matters, further notice will be given.
The EPC development, construction and construction management of photovoltaic power plants is a systematic project that requires the joint efforts of all parties. Through the implementation of these management measures, we expect to standardize the construction process of photovoltaic power plants, improve the construction quality and efficiency of power stations, and contribute to the development of clean energy in China.