Introduction: In the process of subcontracting construction projects, the first list is an important basis for negotiation and settlement between the two parties. This article will take the list of secondary structure labor subcontracting of a project of China Construction Third Engineering Bureau as an example, analyze the composition and rationality of each cost, and make a review of the problems that may be encountered in practice, in order to provide a useful reference for practitioners.
1. Overview of the list.
*The checklist is an indispensable document in the subcontracting of the project, which lists in detail all the items and costs of the subcontracted project. The list involved in this article covers ten items, including planting reinforcement, plastering, hanging steel wire mesh, hanging mesh cloth, ground laying steel mesh, baseboard, roof insulation board paving, exhaust duct and roof hood. The list clarifies the materials provided by A and the materials provided by B, and the various costs are explained in detail.
2. Analysis of list items.
1.Planting reinforcement: The list lists 6 and 10 two planting reinforcements respectively, A for reinforcement, B for other materials. The cost of planting reinforcement varies according to the diameter of the reinforcement, which is in line with the actual situation.
2.Plastering: Drainage ditch plastering project, A for cement mortar, B for other materials. Fees are calculated according to the area, which is also a common way to calculate.
3.Hanging steel mesh sheet and hanging mesh cloth: these two items are made of Party B's ** auxiliary materials. The cost of steel mesh and mesh cloth is calculated according to the area, which reasonably reflects the cost of materials.
4.Ground paving reinforcement mesh: A for A6 reinforcement mesh, other materials for B. The ** of this project is calculated according to the area, which is consistent with the actual construction needs.
5.Baseboard: A for cement mortar, other materials for B. The cost of the baseboard is calculated according to the length, which is also a common calculation.
6.Roof insulation board paving: A for insulation board, other materials for B. The cost of the insulation board is calculated according to the area, which reasonably reflects the cost of materials.
7.Exhaust duct: A for ventilation duct, other materials for B. The cost of exhaust ducts is calculated according to the quantity, which is in line with the actual situation.
8.Out of the roof hood: A for the finished hood, other materials for B. The cost of a hood is calculated by the number of hats, which is also a common way of calculating.
3. Practice**.
1.Definition of responsibilities of both parties A and B: In the actual construction process, both parties should clarify their respective scope and responsibilities. As shown in the list, the quality of the materials provided by A should be guaranteed, and the materials supplied by B should be on time.
2.Reasonableness of cost calculation: When calculating costs, the reasonableness of each cost should be ensured. The cost calculation methods in the list, such as by root, by area, by length, etc., are in line with the actual situation.
3.Visa and settlement: During the construction process, the construction should be carried out in strict accordance with the visa form. The time and quantity on the visa slip should be consistent with the actual situation to avoid disputes. At the time of settlement, the visa form and the actual construction amount are used as the basis to ensure the accuracy and fairness of the project cost.
4.Handling of project changes: During the construction process, in case of project changes, visa procedures should be handled in time to clarify the content and cost of the changes. The change of visa should be signed by both parties to ensure the legitimacy and validity of the visa.
Fourth, summary. The project subcontracting list is an important basis for subcontracting the project. By analyzing the list of secondary structure labor subcontracting of a project of China Construction Third Engineering Bureau, we can see the reasonableness of the costs in the list and the responsibilities of both parties. In the actual construction process, the construction should be carried out in strict accordance with the visa form to ensure the accuracy and fairness of the project cost. At the same time, Party A and Party B should strengthen communication and cooperation to jointly deal with issues such as visas, settlements and project changes. Only in this way can we ensure the smooth progress of project subcontracting and contribute to China's construction projects.
It is hoped that the majority of practitioners will take this as a lesson to improve the importance of project cost management, operate in strict accordance with norms and standards, and contribute to China's engineering construction. construction site