The process of villa decoration is very complicated, after all, the owners of villas are either rich or expensive, and their requirements and your own control of the design quality are very important. I have been doing design for many years, so I will summarize my experience and detail the detailed process of villa construction before, during and after construction.
You should know that as long as the process is right, then even if there is a problem, it can be solved step by step.
Pre-construction process
First, communication.
Early communication between the owner and the company is very important. Ninety percent of the owners don't know what they want, it may be some ** seen on some social software, or it may be a friend's house or a good style when traveling, but these are suitable for themselves, it's hard to say.
The initial communication is a process of choice between the two parties, the owner can look at the strength of the company, look at the model room, and look at the completed construction site, which is an initial communication process.
Second, sign a design contract.
With a design contract, you can start designing, many small companies in order to grab orders, even do not have a design contract, and even send a design plan, which is unprofessional, and can not retain customers.
Third, field measurements.
It is useless to have the plane provided by the owner or the property, the villa must be measured on the spot, because the villa also includes the exterior of the house and the garden, so it must be measured on the spot and get complete drawings, including various interfaces of water, electricity and gas.
Fourth, in-depth design.
As long as the construction has not begun, the person the owner has the most contact with should be his exclusive designer. This process is also an important stage to directly judge whether the designer is professional and whether he has the concept of mansion living.
Luxury house designers must have the life concept of a high-quality mansion, otherwise they can't reach their height, how can they talk about lifestyle?
Of course, the owner chooses the design style, and then the designer comes up with the floor plan, asking how many people live in the owner's house, whether there are elderly people, children, the owner's hobbies, whether there is a need to work from home, and whether there are feng shui considerations. Once the floor plan is settled, it's time to think about in-depth design.
Fifth, ** Sign the construction contract.
Design is for decoration construction, and the profit point is in the construction contract, so this is the ultimate goal of our design company.
Processes under construction
First, the material is determined, and the equipment is determined.
Here you should communicate with the designer about the functional needs of your home, such as the installation of heating, water supply and drainage system, the setting of fresh air system, etc. The standardized villa decoration company will jointly organize and carry out the order meeting of the main materials and equipment with the owner. The brand, type and cost of the main ** materials and other related issues. The designer is involved in the whole process. After determining the materials, the designer will arrange time with you to go to the site to inspect the function and style of the relevant equipment, as well as the installation cost, style matching and other related issues.
Second, demolition and construction.
If the wall needs to be opened, then it needs to be guaranteed by the construction qualification of the decoration company, such as Class B engineering design, Class II building construction qualification, etc.
Third, hydropower projects.
It is the pipes, wires, heating pipes and other buried projects in the ground of your home, also called hidden projects, this must be careful, because it is very troublesome to modify it.
Fourth, acceptance of concealed projects.
For the acceptance of concealed engineering projects, designers, constructors, and project managers will all be present to jointly inspect and find problems in time and solve them together. This link cannot be omitted.
Fifth, mud construction + carpentry construction.
This is very clear, do modeling, do ceiling, do partition wall all need to.
Sixth, mud acceptance.
If there is installation, there will be acceptance.
Seventh, wall engineering, ground engineering.
Painting of the walls, or installation of wallpaper and wall coverings, as well as the installation of bricks or marble on the floor.
Eighth, switch lamps and lanterns and install kitchens and bathrooms.
Switches and light fixtures in the kitchen and all rooms are installed last, so that paint does not brush onto the switches or fall onto the lights.
Ninth, overall acceptance.
The overall acceptance is a process that needs to be checked and filled, and all the steps at home are reviewed. Then it's time to clean.
Post-construction process
When the construction is completed, the owner is invited to accept the inspection, and the owner needs to pay a return visit for half a year or a year, so as to collect the owner's opinions and suggestions on the construction.
In addition, when there is a problem of garden and exterior renovation, I will not talk about it here. I'm just talking about the interior part.