Configuration of the control box in the building automation control system

Mondo Technology Updated on 2024-02-10

The configuration of the control cabinet of the building automation control system is a complex task, which should consider several factors such as system function, number and type of equipment, system size and layout. Here are some basic equipment steps: Building automation system

Determine the brand of the building automation system

After obtaining the bidding documents and bidding drawings, the users and objects are first analyzed, and the brand of the building control products is determined through the specific situation of the building, the owner's demand tendency and other factors.

Design the monitoring point table of the floor control system

After determining the brand, make a monitoring point table of the building automatic control system for product selection. The point table design is generally divided into two situations, one is to provide the point table of controlled equipment in the bidding documents, and the other is to be equipped with the point table according to the actual situation.

Select the controller and power distribution cabinet

After designing the point meter, you need to select the controller and distribution cabinet according to the content of the meter. A controller is typically a device containing a microprocessor chip that receives and processes data from various sensors and actuators, and uses this information to control the operating state of the system.

Installed and equipped with a controller

The installation and configuration of the controller are carried out in strict accordance with the design requirements, including the installation position, wiring mode, communication protocol, etc. of the controller.

Installation and equipping of distribution cabinets

The power distribution cabinet is the power ** equipment of the controller, and it is necessary to select the appropriate distribution cabinet according to the power demand of the controller, and carry out the correct wiring and configuration.

Debugging and testing of the system

After all the equipment is installed and configured, the system needs to be adjusted and tested to ensure that the system is operating normally and that each equipment works according to the design standards.

The article ** in "Shandong Yuqian Electronic Technology ***www.".yqibms.com)

Complete knowledge of building automation system (collection).

What does automatic building control mean?

Intelligent integrated system community: create a new experience of smart life.

Related Pages