Don't be in a hurry to do the next step after the water and electricity is over, there are 7 places to see in person, don't wait for the decoration to be completed and then regret it.
1. Be sure to see if there is a socket in the weak current box. Broadband home is in the weak current box, this socket is to supply power to the optical cat and router, many workers in order to save trouble to leave a wire for you, if you let the broadband master install it for you in the later stage, you may need to charge an additional fee.
2. Be sure to see if there is a lock in the wire box, some of the wire pipe and the wire box may not be aligned, if it can be pulled out, it is okay, if it is blocked by cement, even if it is done point-to-point construction, it may also make the arc become a dead line because of this negligence.
Be sure to see if the hot and cold water pipes on the top of the bathroom have added insulation cotton to you, not only the hot water pipes should be wrapped, but also the cold water pipes should be wrapped, which can effectively prevent condensation, and can also slow down the aging of water pipes, and hot water pipes can also play a role in heat preservation.
4. Be sure.
To see if the position of the sewer pipe in the kitchen has been changed to a right-angle bend, the developer's own water storage bend and other cabinets are installed, and it is very troublesome to clean and repair in the later stage, so it must be changed to this right-angle bend, and the large bend is more smooth than the right-angle bend.
5. Be sure to see whether the position of the top light line is centered, especially the light line in the bedroom, is to remove the flat top on the curtain box and wardrobe and then calculate the center point, it is best to let the workers help you change it in the hydropower construction stage. If you wait until the carpentry is over and then think about it, I'm afraid there won't be one or two hundred, and if you call the plumber and electrician, he may not come.
6. Be sure to see if the position of the water outlet of the shower is a standard 15 cm, and whether it is on the same horizontal plane. There is another detail to pay attention to, that is, after pasting the bricks, we should ensure that the inner wire elbow is recessed into the wall by one centimeter, so that the shower can fit the wall perfectly after installation. In the later stage, it is necessary to apply sealant. Prevent water leakage from the water outlet from penetrating into the wall tiles.
7. Be sure to see whether the height of the wall row is up to standard, the general standard height room is 45 50 cm from the ground after the brick is paved, otherwise after the washing cabinet is installed, the pipe may be exposed outside, and many people step on the pit because the worker has not removed the thickness of the brick. In addition, it is best to make a 90° water outlet with a special drainer, which not only avoids odor rejection, but also saves space under the cabinet.