As an important part of the hospital environment, every step of the production process is crucial, directly affecting the quality and presentation of the final product.
As a veteran enterprise with 25 years of experience in the signage industry, Dongyue has an in-depth understanding of the complete production process of Wayfinding signs and rich practical experience. Today, we will sort out the production process of a guide logo to facilitate you to judge the professionalism of the logo manufacturer.
First, the design stage
Dongyue will have a special project team to conduct in-depth communication with the needs of customers, understand the distribution of departments, functional requirements and cultural characteristics of the hospital, carry out preliminary design, form the appearance and basic style of the logo, and communicate with customers to confirm!
Second, the production preparation stage
According to the determined design plan, Dongyue will select materials, such as metal, acrylic, PVC, etc., to ensure the quality and environmental performance of the materials, and determine the required processes and technologies according to the material and design requirements, such as typesetting, cutting, engraving, painting, etc.
3. Processing and production stage
At this stage, the manufacturer's technical competence is best demonstrated. Dongyue has its own production workshops of tens of thousands of square meters, all kinds of advanced mechanical processing equipment and a strong team of technicians. It has the ability to construct completely according to the drawings to ensure the details of processing, such as grinding, polishing, etc., to ensure quality, practicability and aesthetics.
Fourth, the quality inspection stage
Before the product leaves the factory, the Dongyue Quality Inspection Department will verify the overall identification in accordance with the national standard specifications and the internal quality standards of the enterprise to ensure that there are no scratches, bubbles and other problems on the surface; The illumination of the light source and the mounting hole and angle of the logo are ......Finally, ensure compliance with the requirements of the User Statement.
5. Installation and acceptance stage
The product is qualified to be out of the warehouse, that is, to enter the on-site installation and acceptance link, including on-site survey, installation, acceptance, and put into use.
Sixth, after-sales service
In the process of project execution, Dongyue pays attention to customer experience. The delivery of the product does not mean the end, but the beginning of another work, we will continue to pay attention to the maintenance and update of the logo during the maintenance period to ensure the life cycle and use effect of the logo.