Background:
In 2022, the General Office of the Communist Party of China issued the "Implementation Plan for Rural Construction Actions" (hereinafter referred to as the "Plan"). The plan points out that by 2025, substantial progress will be made in rural construction, the rural living environment will continue to improve, and farmers' sense of gain, happiness and security will be further enhanced.
Rural areas should inherit and protect traditional village dwellings and excellent local culture, highlight regional characteristics and rural characteristics, retain rural features with local characteristics and local flavor, prevent mechanical copying of urban construction models, and create a modern version of the "Fuchun Mountain Residence Map" with its own characteristics.
Question:
Please use BIM software to design and demonstrate a set of rural residential courtyards, with a land area of 240 square meters, 20 meters long and 12 meters wide, and the construction area of the designed house does not exceed 350 square meters. The design includes the fence, gate and courtyard buildings, structures (load-bearing structure, insulation, waterproofing), plumbing, electricity, kitchen and bathroom, and small courtyard environment.
Requirements: 1. "You can see the mountains, you can see the water, and remember the nostalgia." "It is clear that the area where the designed residential courtyard is located should conform to the cultural attributes of the local climate, ethnicity, customs and other cultural attributes. For example, if you build a house in Xishuangbanna, Yunnan Province, you need to consider the Dai customs and traditional culture, and the local weather such as temperature and humidity.
2. The building structure can be wood structure, brick-concrete structure, steel-concrete structure, stone structure, etc., according to local conditions. Participating teams need to use BIM software to export the plan, elevation, section and master plan of the building and structure. When it comes to waterproofing, it is necessary to produce a waterproof construction drawing.
3. Combined with the actual needs of the peasant masses, whether to build household reservoirs, basements for storing vegetables, granaries, solar panels, garden landscapes, etc. Participating teams can play on their own and justify themselves.
4. The participating teams need to export the engineering quantity according to the model and calculate the housing cost according to the comprehensive construction method. At the same time, the construction simulation software is used to simulate the progress and construction plan.
5. The participating teams need to deposit the brief design specification, model, ppt, drawings and related simulation files of the work into the USB flash drive and mail it to the School of Civil Engineering of Shijiazhuang Tiedao University before the deadline.