The latest progress of the hospital construction project is here!

Mondo Social Updated on 2024-02-01

Recently. A number of hospital construction projects ushered in new progress.

Jinghe Hospital Affiliated to Xi'an Jiaotong University

Jointly organized by the Jinghe New Town Management Committee and Xi'an Jiaotong University, it is built in accordance with the standards of a tertiary hospital, with a total construction area of about 300,000 square meters, including 15 single buildings, and is expected to open internal medicine, surgery, cardiovascular and cerebrovascular, assisted reproduction, oncology and other departments, providing 1,500 beds, which can meet the daily outpatient volume of more than 5,000 person-times and the annual outpatient volume of more than 1 million person-times.

Up to now, all the main structures in the east and west areas of the hospital have been completed, and the façade curtain wall construction and interior decoration are underway, and it is expected to be put into operation in 2024.

Xi'an Traditional Chinese Medicine Hospital

Located in the Energy Golden Trade Zone of Xixian New Area, it is a first-class general hospital with 802 beds, a total of 29 clinical departments and 11 medical and technical departments. Relying on the mature operation and management experience and medical team of Xi'an People's Hospital, priority is given to the development of ophthalmology, obstetrics and gynecology, brain, chest, orthopedics, cardiovascular medicine, etc.

Up to now, the construction of stone and aluminum curtain wall on the façade of the hospital's inpatient department has been completed, and the installation of integrated panels, glass curtain walls, doors and windows has been completed; The construction of stone and decorative thermal insulation coatings on the façade of the outpatient building has been completed, and the main pipelines for ventilation, air conditioning and fire protection have been completed by 90%; The civil air defense door and civil air defense ventilation construction of the underground garage have been completed, and the decoration of the underground garage has been completed by 90%. Interior decoration and outdoor greening are underway, and will be put into operation in 2024.

Shaanxi Provincial Institute of Traditional Chinese Medicine

Relocation Project (Phase I).

Located in Fengdong New Town Free Trade Service Trade Industrial Park, it is the first public tertiary hospital in Fengdong New Town focusing on traditional Chinese medicine diagnosis and treatment, mainly building a traditional Chinese medicine research center (including 5 floors of scientific research building, 4 floors of animal experiment center, and 11 floors of comprehensive laboratory building) and a regional dominant disease research center (including 4 floors of outpatient medical technology building and 15 floors of inpatient building), with 500 beds planned.

Up to now, the main structure of the five buildings in the first phase of the project has been capped, and the installation of masonry, plastering and comprehensive line pipe of the secondary structure has been completed. The construction of the exterior walls of the animal experiment building, inpatient building and comprehensive building is 99% complete, and it is expected to be put into operation in 2025.

In recent years, Xixian New Area has promoted the construction of medical and health projects with high standards and high quality, and continuously improved the supply capacity of high-quality medical resources in the jurisdiction. Up to now, 3 ** hospitals have been built and put into use, with 3,310 new beds; 6 ** hospitals are under construction, with 5,500 new beds after completion, which will effectively improve the medical service facilities in the new area.

*丨Xixian New Area

Edit丨The sea

Audit丨Pisces Danyang

Related Pages