Since the start of construction of Metro Line 5.
The construction of Beihua Road Station is advancing rapidly.
Now the second round of traffic guidance reform is being carried out.
Wuxi Metro Line 5Beihua Road StationLocated at the intersection of Jianshe Road and Beihua Road, the total length of the station is 1464 meters, station width 2279 meters. The south side of the construction area is the Xinan Mansion business district, and the north side is the T&T China commercial area and residential area.
What's new.
How to ensure everyone's travel.
Beihua Road Station of Metro Line 5 is located at the intersection of Jianshe Road and Beihua Road, and is arranged along Jianzhu Road in an east-west direction. The scope of the fence on the west side will be adjusted, and pedestrians and vehicles entering and exiting Yuexi Court are requested to pay attention to the traffic signs.
Note!!!
There is a 3-meter-wide road to the north of the station.
It is open to non-motorized vehicles and pedestrians.
There are four-lane lanes in both directions on the south side of the station.
It is for motor vehicles.
During construction.
The east-west traffic pressure of the construction road is greater.
East-west motor vehicles are recommended.
Take a detour to Taihu Avenue or Liangqing Road.
In addition, Beihua Road Station is located in a downtown area.
In order to do a good job in this traffic guidance and reform work.
Wuxi Metro Construction Team.
Actively communicate with community streets.
Visit the surrounding residents and shops.
Cooperate with the traffic police department to formulate a traffic relief plan.
Ensure the rapid progress of subway construction.
The Spring Festival is approaching. Citizens and friends should pay attention to safety when traveling
*: Wuxi Metro Construction Co., Ltd. Editor: Yiyi.