When decorating or buying materials, everyone usually knows that the ** of the group will be more economical than the individual operation. For example, when a certain owner is renovating, the neighbor happens to be planning a similar project, so the two parties discuss finding the same plumber master. Due to the simultaneous construction of the two companies and the adjacent location, the master gave a manual fee of 30 yuan per square meter, which is obviously more cost-effective than the market price. Initially, the owners and neighbors were satisfied with this and plan to continue working in this way in the future.
However, when the neighbor's water and electricity project was not completed, the owner questioned the master's craftsmanship, saying that the workmanship was poor. The owner felt that the master had opened too large a hole when renovating the strong electric box, which might affect the wall structure. At the same time, the layout of the line is also considered to be non-standard, which affects the paving tiles. As a result, the owner requested to terminate the cooperation with the master, much to the surprise and dissatisfaction of both the neighbors and the master.
The neighbors did not understand the standards of the hydropower project, and only felt that the group construction was cost-effective, so they were surprised and angry at the owner's opinion. It turned out that the owner insisted that the master should build first in order to test his craftsmanship, and if there was a problem, the cooperation would be terminated. The master was dissatisfied with this, because the ** of 30 pieces of one square already contains the corresponding process. At the same time, the hydropower project has not yet been completed, some details have not been adjusted, and the owner should not easily terminate the cooperation. Since the owner questioned the master's craftsmanship, the neighbor also stopped the construction and said that he would not pay the manual fee.
This situation is not uncommon in renovations. Many people, like the owners, only focus on the construction cost and ignore the craftsmanship of the master, which leads to problems. Therefore, when decorating, even if you choose to form a group, you should have a clear understanding of the master's craftsmanship and material quality to ensure that the decoration quality is not affected. Do you have any similar experience when decorating?