According to the "Xiaoyi Radio and Television Station", on February 29, the Management Committee of Shanxi Xiaoyi Economic Development Zone, Shanxi Pengfei Group (hereinafter referred to as Pengfei Group), and Fujian Judian New Energy Co., Ltd. (hereinafter referred to as Fujian Judian) held a signing ceremony for the manufacturing and production project of solid-state lithium batteries and PACK with an annual output of 10GWh.
According to the agreement, the signatories will invest about 10 billion yuan to build an annual output of 10GWh solid-state lithium battery and pack manufacturing and production project in Xiaoyi Economic Development Zone, covering battery cell workshop, electrolyte depot, power center, etc., focusing on solid-state lithium battery technology research and development and battery assembly manufacturing, which can be widely used in power, energy storage and other fields.
According to the data, Pengfei Group, founded in 1993, is a digital, intelligent, recycling, and green enterprise integrating coal, coke, chemical, electricity, hydrogen energy, smart logistics, real estate, cultural tourism, and other provinces.
Fujian Judian is a state-owned holding company under Fujian Provincial Bidding and Procurement Group, and now has a technical team mainly composed of masters, doctors and senior professionals, mastering the manufacturing technology of polymer large-capacity lithium batteries with a single capacity of 500ah.
The author understands that in addition to settling in Xiaoyi, Shanxi, in August 2023, the first phase of the "Phase I project of Jiangxi Judian New Energy Technology Co., Ltd., a shareholding company of Fujian Judian, with an annual output of 10GWh solid-state lithium battery and PACK manufacturing and production, started in Longnan, Ganzhou, Jiangxi Province.
Jiangxi Judian solid-state energy storage battery production base project has a total investment of 10 billion yuan, a fixed investment of 6.5 billion yuan, a land area of about 600 acres, and an annual production capacity of 10GWh solid-state lithium battery, pack system and energy storage system. The project is constructed in two phases, of which the total investment of the project is 1675 million yuan, the project land area is about 320 acres, the total construction area is 72,000 square meters, and the total production capacity of the first phase of the project is an annual output of 2GWh single large-capacity solid lithium battery and 2GWh pack.
*: New materials for lithium batteries.
Disclaimer:All works marked with "**or"** in this number are**network**, and the copyright belongs to the original author and the original source. The content shared is the author's personal opinion, which is only for readers' learning and reference, and does not represent the views of this number.