There is a lot of rain in southern China, and the return to the south caused by the convergence of cold and warm airflows also occurs frequently. In the season of returning to Nantian, many friends who have bought a new house will be very concerned about whether the decoration of the home can be constructed normally? I am very worried that the humidity of returning to Nantian will cause many hidden dangers to be left after the renovation. So, can Hui Nantian be constructed? What problems should I pay attention to during construction? Today, we will talk about this topic with the Wen Chuangchuang designer of Golden Space, and everyone should collect this strategy!
Huinantian wire layout must be paid attention to, to standardize the operation, exposed outside the wire end, should be insulated protection. Especially in places that are prone to rain such as balconies, be sure to wrap the copper wire ends that are exposed to the outside of the wires when the wires are buried to prevent the wires from short-circuiting when they get wet. This is especially true for wires that are wrapped around damp wooden keels, large core boards, and other wood products.
If the room is humid, you should pay great attention to the use of electrical appliances to avoid short circuits**. Before starting construction, it is necessary to confirm that the fire hydrant of the corridor is intact and effective, and the fire extinguisher must be necessary at the construction site.
Although the humidity of Huinantian is heavier, slowing down the drying speed of cement and concrete, the effect of condensation and drying will be very good, which greatly reduces the phenomenon of cracking in the later stage.
If the quality of the wire is lacking, or the terminal is wet and not insulated, it is easy to have the risk of leakage, so before laying the circuit, we must ensure that the wire head is insulated, and the pipeline and the wire itself must be kept dry, and do a good job of moisture-proof treatment to prevent short circuit.
If you paint at this time, the water vapor is in the paint, which will make the color of the wall or furniture uneven, and there will be stains, which will not only affect the aesthetics, but also affect the durability of use.
If waterproofing is done at this stage, it may lead to a gap between the waterproofing agent and the base surface, and the bonding is not compact, resulting in water leakage and water seepage in the later stage, and even the risk of cracking.
Carpentry is the most affected process in the Huinantian season, because of the characteristics of the wood itself, moisture will lead to expansion, and it is difficult to avoid the problem of moisture in the humid air environment of Huinantian.
Finally, I would like to remind you that many process steps in the decoration have a "technical intermittent time", for example: cement requires a 24-hour solidification period; Scraping putty has to go through a drying period every time, and it can be scraped again after each time it is dry; However, when returning to Nantian, the interval time of this technique generally needs to be extended, and you must wait patiently so as not to affect the comfort of the later check-in!