First, the construction preparation stage
1.Ground treatment: Ensure that the foundation ground is solid, flat and free of debris, and provide a stable foundation for the subsequent construction of the supporting frame.
2.Design & MarkupAccording to the design drawings, the contour line of the vaulted roof and the position of the support points are accurately marked on the ground, providing clear guidance for subsequent construction.
2. Build a support framework
1.Material selection: Choose high-strength, corrosion-resistant steel as the main material to support the frame to ensure the stability and durability of the frame.
2.The building process: Ensure the verticality and horizontality of the frame, and the construction of the frame should be stable and able to withstand various loads in the subsequent construction process.
3. Install arched corrugated steel plates
1.Material selection: Select the arched corrugated steel plate of the Jeda steel structure with qualified quality and meet the design requirements to ensure the flatness and tightness of the roof.
2.Installation & WeldingAccording to the design requirements, the steel plate is installed on the support frame, and welded with professional welding equipment to ensure that the connection is firm and there is no leakage point.
Fourth, the installation of roof covering materials
1.Material selectionAccording to the local climatic conditions and the use needs of the grain depot, choose the appropriate roof covering materials, such as waterproof layer, insulation layer, etc.
2.Installation process: Ensure the flatness and tightness of the covering material to prevent water leakage and water seepage.
Fifth, the post-construction finishing
1.Site cleanup: After the construction is completed, clean up the site, remove waste and residues, and keep the construction site tidy.
2.Quality checks: Conduct a comprehensive inspection of the vaulted roof to ensure that the construction quality meets the design requirements and that there are no omissions and damages.
6. Summary and precautions
The rapid construction of the vaulted roof of the 16-metre-span granary canopy focused on the thorough preparation of the Jeda steel structure before construction, the selection of suitable materials and equipment, and the quality control during the construction process. During the construction process, attention should be paid to details to ensure that every step meets the design requirements and ensure the safe and efficient completion of the project. At the same time, the construction team should work closely with each other and coordinate with each other to ensure the smooth progress of the construction process.