Take multiple measures to ensure power supply during the Spring Festival

Mondo Social Updated on 2024-03-06

The Spring Festival holiday is a critical period for ensuring power supply and safe production. In order to ensure the safe and stable operation of power grid equipment during the Spring Festival, Anhui Sanhuan Electric Power Engineering Group, the provincial industrial unit of Fuyang Power Supply Company, commanded and deployed in advance, coordinated resource allocation, strengthened emergency support, and took multiple measures to ensure power supply during the Spring Festival.

The first is to take the implementation of safety responsibilities as an important part of supervision, and the company's discipline inspection committee and safety supervision department will work in the same direction. Supervise and urge the safety and production departments to implement risk management and control in the field of safety production supervision, consolidate the main responsibilities of business departments, strengthen publicity and education on safety risk prevention and control for all employees, and timely grasp the psychological dynamics of employees through micro-reminders, micro-warnings and micro-services, do a good job of safety supervision and reminders, and shoulder the responsibility of ensuring power supply.

The second is to promote the optimization of the power business environment. In order to ensure the smooth return of new energy vehicle owners during the Spring Festival, personnel will be stationed at the charging station in the high-speed service area during the peak period of returning home, and the inspection of the charging piles in the service area will be strengthened to ensure the normal use and charging efficiency of the charging piles. At the same time, explain the correct use of charging piles and safety precautions to the owners who come to charge, answer the problems encountered by new energy vehicle owners in the charging process, and find and solve the fault of the charging pile in time.

The third is to continue to strengthen the inspection of line equipment. Since the heavy snowfall, the company has organized line inspectors to carry out remote cold weather special inspections on important lines. At the same time, high-tech elements are injected into the line patrol work, and the line equipment data analyst cooperates with the drone pilot at the line patrol site to jointly carry out remote line equipment inspection. "We use drones to comprehensively check the situation of wires and fittings, and use infrared thermometers to measure the temperature of the lap points of the line tension tower, so as to grasp the operation of the line in time. "The patrol operator introduced.

Fourth, strengthen the emergency response and emergency repair support. The company organized the inventory of emergency materials in advance to ensure that the commonly used materials such as cable heads, arresters, strut insulators, etc. are fully prepared, have good performance and are available at any time. The warehouse manager is on duty 24 hours a day to ensure that the emergency is on call at any time in an emergency situation, and the emergency repair materials are timely. Li Meijun, Hong Wenshan).

Related Pages