In renovation, hydropower works are considered to be one of the most professional projects. Compared with other projects, hydropower engineering requires a master to have certain professional skills, because there are many complex contents involved. However, the acceptance of hydropower projects also requires some professionalism, otherwise it is difficult to achieve effective acceptance only through superficial observation.
During the renovation, an owner questioned the water and electricity project completed by the master, saying that it was unprofessional. At first, the master thought that the owner was a professional, but after understanding the reason, he found that the owner mainly judged the professionalism of the hydropower project by its appearance. The owner pointed out that the wiring looked messy and untidy compared to other masters, which caused him to be in a bad mood for the acceptance of the entire hydropower project. He was faced with the problem of whether to let the master rework, and at the same time worried that the quality could not be guaranteed after the rework.
The master explained that the insiders of the hydropower project can judge the quality from the wiring method and the treatment of the wire end, while the owner is inaccurate to judge only by the appearance. He said that the reason for the messy line is to lay the most advanced road out of consideration, which is to save materials, while minimizing current resistance and ensuring electricity safety. Therefore, the appearance of the line may not be neat, but it is reasonable under professional consideration.
From this situation, it can be seen that there is a problem in the professionalism of the owner to judge the hydropower project by its appearance. The master's explanation shows that professionalism is not only reflected in appearance, but also needs to be judged from the internal wiring method and processing skills. When accepting hydropower projects, it is recommended that non-professionals find professionals to carry out the acceptance to ensure the quality and safety of the project. What do you think about this situation?