This year, the city plans to renovate 47 dangerous bridges on rural roads

Mondo Three rural Updated on 2024-03-06

Shaoyang** Yun Shaoyang Client, March 4 (Reporter Liu Bo, Correspondent Nie Changchun) On March 4, at the construction site of the reconstruction of the Qilimiao Bridge on the X006 line in Longhui County, the crusher waved its long arm and began to transform the bridge. The start of the reconstruction and construction of the Qilimiao Bridge marks the official opening of the city's 2024 rural highway dangerous bridge transformation.

Qilimiao Bridge is located in Yankou Town, Longhui County, and the total length of the renovated Qilimiao Bridge is 2204 meters, 7 meters wide5 meters, 1*16m prestressed concrete simply supported hollow slab bridge, with a total investment of 1.38 million yuan. After the completion of the reconstruction and construction of Qilimiao Bridge, it will effectively improve the travel safety of the people along the Matoushan to Hengban Bridge, facilitate the economic exchanges between towns and towns along the line, and is of great significance for improving the regional road transportation network and rural economic development.

It is understood that most of the rural highway bridges in our city are older, due to low design standards, rough construction technology, management and maintenance are not in place and other historical reasons, resulting in different degrees of damage. With the development of rural economy, the traffic volume has increased dramatically, and the old bridge can not meet the overload operation, and many dangerous highway bridges have seriously affected the smooth flow of the rural road network, becoming a "bottleneck" restricting rural traffic and rural economic development.

In order to comprehensively improve the quality of highway traffic in China and ensure the safety of the people, this year, the city will increase the investigation and rectification of potential safety hazards of rural highway bridges, and actively raise funds to transform 47 dangerous bridges in 2024, with a total planned investment of 57.02 million yuan.

According to the relevant person in charge of the Municipal Rural Highway Department, the dangerous bridge reconstruction project will be accelerated, the quality, safety and progress control will be strictly controlled, and the dangerous bridge will be transformed into a connecting bridge, a safe bridge and a reassuring bridge for the masses, so as to ensure the safe travel of the masses, open up the "road to prosperity" for rural development, and provide a strong traffic guarantee for rural revitalization.

Related Pages